Contracts
Construction & building works in London
Public sector contract notices in construction & building works covering London, from Find a Tender and Contracts Finder.
Construction & building works notices in London
-
ClosedSmall-firm friendlyFramework
Disabled Facilities Adaptations DN805651 RESID 2526-106
London Borough of Brent is setting up a framework for disabled facilities adaptations on Council tenant properties across the borough. The Council will handle design, management and inspection; contractors will carry out the installation works only.
-
Closed
British Museum Round Reading Room Roof Oculus Works
Principal Contractor needed for major roof repair and replacement on the Grade I listed Round Reading Room at the British Museum. Work includes flat roof replacement, copper dome conservation, and glazed lantern refurbishment on this 1857 building.
-
ClosedSmall-firm friendly
A Store Refurbishment – Roller Shutters Replacement
Science Museum Group wants to replace 7 roller shutter doors across their estate. The contract covers design and installation.
-
ClosedFramework
Westminster Housing Responsive Repairs and Major Works Contracts
Westminster City Council is re-procuring eight separate contracts for responsive repairs, voids, major works, mechanical, electrical, heating, lifts, and aids & adaptations across its 21,000-home housing stock. Contractors will be required to sign a FAC-1 Framework Alliance Agreement alongside individual contract terms.
-
ClosedSmall-firm friendly
Provision for Lee Valley Sewardstone Campsite Landscaping & Associated Works
Lee Valley Regional Park Authority needs to relocate 6 static caravan pitches and clear about 1300 m² of scrub to make room for 10 new pitches at Sewardstone Campsite. The work includes creating two new access roads, parking spaces, and pedestrian footpaths.
-
ClosedSmall-firm friendly
Fitzmary - secure fencing tender
Remove existing timber perimeter fencing and install new 4m high secure fencing with anti-climb and ligature-resistant design at Fitzmary House, Bethlem Royal Hospital. Work includes foundations, gates, and privacy screening across two areas.
-
ClosedSmall-firm friendly
GL RFCA Kensington ARC Boiler Replacement
Replacement of existing central heating boiler plant and equipment at Kensington Army Reserve Centre, a 1903 drill hall in London. The work includes replacing two gas-fired boilers, hot water storage heaters, and associated equipment.
-
ClosedSmall-firm friendly
Hard FM - Building Fabric Repairs, Maintenance and Minor works Contract - Corporate Estate
Lewisham Council wants a hard facilities management contractor to handle reactive repairs, emergency response, planned maintenance and minor works across approximately 70 corporate properties including offices, libraries and community buildings. The contract covers roof work, joinery, doors and windows, guttering and general building fabric services.
-
ClosedSmall-firm friendly
SCC Spirit Store Container Replacement
The Horniman Museum needs a replacement refrigerated container to store organic and biological specimens preserved in flammable spirits like alcohol and formalin. They want a contractor to develop the design and build it.
-
ClosedSmall-firm friendly
Large Infill Modernisation Phase 2
The Science Museum needs a lift modernisation at their main London site, including design, supply, installation, testing and commissioning. The work includes dismantling and removing the existing lift.
-
ClosedFramework
Southern Housing Fire Remedial Frameworks
Southern Housing is establishing two frameworks for fire remedial works across their property portfolio. Lot 1 is for low-value projects suited to SMEs; Lot 2 is for high-value projects suited to larger suppliers.
-
Closed
MEP Tender Notice
The Courtauld Institute is tendering for mechanical, electrical and plumbing works as part of a major building project. The scope includes stripping out existing services, installing new drainage, water supply, sanitaryware and hot water systems.
-
ClosedSmall-firm friendly
MW2522 - Birch House - Roof Replacement
Hastoe HA is replacing the roof covering at Birch House in Kingston upon Thames, with associated works. The contract is worth £80,000.
-
ClosedSmall-firm friendly
Kitchens and Bathrooms Installation Scheme
Watmos Community Homes wants to install fitted kitchens and bathrooms across approximately 1000 units over 5 years, split between Walsall and London estates. Work includes kitchen fitting, plumbing, sanitary works, and associated finishing.
-
Closed
HAR6071 Brunton Wharf Main Works
Tower Hamlets seeks a main contractor for a 2-stage design & build project to construct 32 affordable rent residential units on Brunton Wharf Estate in Limehouse, with associated amenity space, play facilities, and estate improvements. The scheme is classified as a High-Risk Building under the Building Safety Act.
-
ClosedSmall-firm friendly
Structural works at Samuda estate underground carpark (Phase 2)
Phase 2 structural works to an underground carpark at Samuda estate, focused on concrete work. All work must meet current building regulations, British standards and recognised good practice.
-
ClosedSmall-firm friendly
Sprinkler and Remedial Works
Installation of sprinkler systems and associated remedial works on the 4th floor of a new 10-level mental health research and treatment facility. Ceiling removal and other works required to accommodate the sprinkler system in a CAMHS unit.
-
ClosedSmall-firm friendly
SWLSTG NHS Tolworth Hospital Window Manifestations
Design, supply and install vinyl window manifestations as part of the Tolworth Hospital redevelopment. The work is at a single NHS site in south west London.
-
ClosedSmall-firm friendly
Teddington Allotments Reclamation Works at Shacklegate Lane Cemetery
Extend Shacklegate Lane Cemetery onto adjoining former allotment land to create additional burial capacity. Works include landscaping and site preparation as a natural continuation of the existing cemetery.
-
ClosedSmall-firm friendlyFramework
Commercial Boilers Installations Framework Agreement 2026 - 2030
Framework agreement for supply, installation, testing and commissioning of commercial boiler systems. Covers labour, materials, equipment and services to meet statutory requirements and manufacturer specifications.
-
ClosedSmall-firm friendly
Provision of Servicing and Maintenance of Chiller (HVAC) and AC units to Kingston University
Kingston University needs a contractor to service and maintain their chiller and air-conditioning units. Work includes planned preventative maintenance, reactive call-outs with emergency cover, minor repairs, and annual condition reviews.
-
ClosedSmall-firm friendly
Multi Use Games Areas and Outdoor Gyms
Westminster City Council wants a contractor to refurbish the Fisherton Outdoor Community Gym and Playground. The work includes building construction, refurbishment, and installation of multi-use games areas and outdoor gym equipment.
-
ClosedSmall-firm friendly
NHM150 Western Galleries - AV Hardware Integrator
The Natural History Museum is seeking an AV Hardware Integrator to work on fit-out of four major galleries as part of Phase 2 of the NHM150 Western Galleries programme. The role involves coordinating AV systems, interactives and lighting across the galleries within their Grade I listed building, with emphasis on sustainability and accessibility.
-
ClosedSmall-firm friendly
Lift Refurbishment and Replacements – Keel Court, Green Dragon Court, Fairlead House and Bordeaux House
The Riverside Group needs lift replacements and refurbishments across four residential buildings in east London. Work must start soon after award and run concurrently at multiple sites.
-
ClosedSmall-firm friendly
Culvert Crossing and Groundworks
Natural England needs a culvert installed at Aqualate Headquarters to allow heavy vehicle and machinery access to the backyard. The work will enable future groundworks and possible building development.