Contracts
Construction & building works in London
Public sector contract notices in construction & building works covering London, from Find a Tender and Contracts Finder.
Construction & building works notices in London
-
ClosedSmall-firm friendly
The Quarterdeck and Explorers Court - Lift Replacement
Replace traction-type firefighting-enabled lifts at two residential buildings in Canary Wharf, E14. The work spans around 12 months including design, Building Safety Regulator approval, and on-site installation.
-
ClosedSmall-firm friendly
Lexington Apartments - Lift Replacement
Replace lifts at Lexington Apartments in Slough with traction type, firefighting-enabled units to a specification by Frankham Consultancy Group. The work runs approximately 12 months and includes design, Building Safety Regulator approval, and onsite installation.
-
ClosedFramework
Framework Agreement for Construction and Infrastructure Works (Minor, Major and Depot Projects)
GWR is establishing a three-year framework for construction and infrastructure works across its stations, depots, and operational facilities. Work will be called off via mini-competitions under JCT contracts.
-
Closed
Basildon Station Platform Replacements (1&2) GRIP 5-8 2026
C2C Railway is seeking a JCT Design & Build contractor to completely renew platforms 1 and 2 at Basildon station, including two passenger lifts and associated infrastructure. The work follows serious structural defects found in the 1970s-built platforms.
-
ClosedFramework
Network Rail Commercial Property Maintenance Framework PSQ
Network Rail is establishing a framework for commercial property maintenance covering general building trades, M&E systems, civil works, and emergency response. This is a multi-year arrangement to handle routine and reactive work across their estate.
-
Closed
Network Rail - Wales and Western - Electric Vehicle Infrastructure Installation
Network Rail is installing EV charging stations across 45 sites in Wales and Western region, with chargers ranging from 22 kW to 150 kW. The work includes site assessments, design, procurement, installation with electrical and civil works, testing, commissioning, and staff training.
-
ClosedSmall-firm friendlyFramework
Sludge Holding Tanks & Roofs
Thames Water is seeking suppliers to design, supply, install and commission sludge tanks, digesters, and associated roofs at various wastewater treatment works. The scope includes related items and is being structured as a framework to support future programmes.
-
ClosedSmall-firm friendly
UK4 - OTM Conveyor Maintenance & Spares
Supply of conveyor chain, shafts, support kits and belts for Ballast Cleaning Systems 4/5, plus conveyor shaft overhauls and repair and maintenance services. Work ordered via purchase orders under the NR13(D) Framework Agreement.
-
Closed
Hopkinson House Main Works Contractor
Main contractor to carry out Category A fit-out of Hopkinson House to create 31 temporary accommodation apartments. Work includes new MEP services, fire safety systems, finishes, thermal upgrades, and external improvements, with handover planned for 2026.
-
Closed
National Gallery Research Centre Fit Out
National Gallery is seeking a contractor for the fit-out works on its new Research Centre, connecting the Sainsbury Wing and Wilkins Building. The scope includes MEP systems, all finishes, joinery, and access elements.
-
ClosedSmall-firm friendly
National Gallery Research Centre Excavation and Structures
The National Gallery is creating a research centre connecting the Sainsbury Wing and Wilkins Building. This contract covers demolition, excavation with archaeological investigation, structural works including underpinning, lift installation, and civil construction.
-
Closed
Avalon House Refurbishment & Extension Works - Scrutton Street, London
Portsmouth City Council is procuring a contractor for comprehensive refurbishment and one-storey extension of a central London office building at Scrutton Street, Hackney. Works include full façade replacement, basement reconfiguration, rooftop extension with green roof, and delivery of a BREEAM Excellent-rated fully electric building.