Construction & building works in London
Public sector contract notices in construction & building works covering London, from Find a Tender.
SortClosing soonestLargest valueA to Z
Construction & building works notices in London
-
Closed
505-511 Archway Road
London Borough of Haringey is seeking a main contractor for a 16-unit housing scheme at 505-511 Archway Road. The contract covers all construction works for the residential development.
-
ClosedSmall-firm friendly
Procurement for National River Flow Archive Peak Flows Dataset Maintenance
Maintain and operate the National River Flow Archive Peak Flows Dataset, a UK-wide collection of river flow data used for flood estimation. The contract runs four years from April 2026.
-
ClosedSmall-firm friendly
Albion Works Replacement Project
Replace 21 internal flat entrance doors, 1 external front door, and 1 external electrical riser door. The buyer is seeking suppliers to carry out this work on the Albion Works Replacement Project.
-
ClosedSmall-firm friendly
London Campus Planned Preventative Maintenance Contract
University of Staffordshire's London campus needs planned and reactive maintenance services covering three units (31,000 sq ft) at Here East Estate in Stratford. The contract runs for two years with optional one-year extensions, requiring alignment with SFG20 standards and an established sub-contractor network.
-
ClosedSmall-firm friendly
Provision of New Roof Coverings at Whitechapel Fire Station
London Fire Brigade is replacing the roof coverings and insulation at Whitechapel Fire Station. The work includes new roof coverings, insulation, and associated works.
-
ClosedSmall-firm friendly
Provision of New Roof Coverings at Finchley Fire Station
London Fire Brigade is replacing roof coverings, insulation and associated works at Finchley Fire Station. The project is valued at £1,000,000.
-
Closed
Procurement of the Development Agreement Related to a Low Carbon Heat Network in the Square Mile
City of London Corporation is seeking a Heat Network Development Partner to design and develop a low-carbon district heating network across the Square Mile. The partner will work through a special purpose vehicle, develop the scheme to approval stage, then-if approved-move into delivery and operation under a shareholders' agreement.
-
Closed
Building Fabric and Drainage MTC
Royal Borough of Greenwich wants cyclical and reactive maintenance across roughly 760 buildings in its estate. The contract covers building fabric (Lot 1) and underground drainage (Lot 2) separately; you can bid for either or both but can only win one.
-
ClosedSmall-firm friendly
Electric Vehicle Charging Point installation, operation and maintenance
Lewisham Council and Royal Borough of Greenwich seek a supplier to install, operate and maintain electric vehicle charging points across both boroughs. The contract is funded through the LEVI scheme and runs for 15 years with a possible 1-year extension.
-
Closed
HAR6073 Caxton Grove Main Works Tender
Tower Hamlets is contracting the construction of a seven to nine storey residential block with 36 affordable homes and a new community centre in Caxton Grove. The existing community centre will be demolished and rebuilt within the new building envelope.
-
ClosedSmall-firm friendlyFramework
Mechanical & Electrical Contractors Framework
Nottingham Trent University is establishing a mechanical and electrical works framework with two lots: mechanical works and electrical works. Successful tenderers will compete for individual projects ranging from design-and-build installations to call-outs and remedial works.
-
ClosedSmall-firm friendly
LB Hillingdon- Highways Term Service Contract
London Borough of Hillingdon wants a single contractor to handle both capital investment works (road safety schemes, TfL-funded improvements, off-highways repairs) and routine reactive maintenance (drain cleaning, pothole repairs, footway defects, crossover installation) across the borough. The contract runs for 7 years with an optional 5-year extension.
-
ClosedSmall-firm friendly
Home Group - Responsive Repairs, Planned Works & Voids (Greater London North and South)
Home Group wants a single contractor to handle responsive repairs, planned maintenance, and void preparation across their 5,600 homes in Greater London North and South. The contract runs 5 years from October 2026, with optional 3 and 2-year extensions, at roughly £5m per annum.
-
ClosedSmall-firm friendly
Ceiling Mounted Utilisation Sensors
South London and Maudsley NHS Trust needs uninstalling, reinstalling, and ongoing storage management of 500 ceiling-mounted desk utilisation sensors and 251 WiFi gateways across its sites. The work includes disconnecting existing equipment, reconnecting it, and warehousing unused stock with inventory tracking.
-
ClosedSmall-firm friendly
CM52 / T0528 - Wormleighton Site Decommissioning
Trinity House needs a contractor to dismantle a mast, buildings, and substructures at Wormleighton, then return the site to greenfield suitable for agriculture. Work must complete by end of October 2026.
-
ClosedSmall-firm friendly
UEC Middle House Refurbishment (Works)
Refurbishment works at UEC Middle House, Denmark Hill. The buyer is seeking a contractor to carry out the work; further details are in the tender pack.
-
ClosedSmall-firm friendly
Lots Road Open Space
RBKC is constructing a new temporary open space at Lots Road in Chelsea. Work includes paving, planters, seating, play equipment, and planting to a fixed design.
-
ClosedSmall-firm friendly
Great Place to Work Estates Refresh
SLAM needs design and installation of floor-to-ceiling wall vinyls and window vinyls across their estate to promote their 'Great Place to Work and Care' employer brand. Work covers multiple sites within the Trust, focusing on reception areas and communal spaces.
-
ClosedSmall-firm friendly
Privacy For All Batch 4
London Fire Brigade is upgrading multiple fire stations to install gender-neutral facilities. Work includes stripping out existing dormitories and changing/washing areas, installing new facilities, and all temporary works while stations remain operational.
-
ClosedSmall-firm friendly
Electrical Rewire at Childs Hill Library
London Borough of Barnet is rewiring Childs Hill Library, including small power, lighting, fire alarm and lightning protection systems.
-
Closed
BBC Music Studios, East Bank. Fit Out Works
BBC is fitting out a new music studios building on the Stratford Olympic site in East London. The work includes designing and delivering the interior fit-out for live music production facilities.
-
ClosedSmall-firm friendly
Build Elements for Temporary Sarrut Exhibition
Design, manufacture and install gallery structures for a temporary WWI art exhibition at the National Army Museum, plus remove the previous display. Work includes decoration but not flooring or ceiling.
-
ClosedSmall-firm friendly
Saville House Roof Replacement
London Borough of Newham needs the roof replaced on Saville House, an 8-storey residential block in E16. The work is valued at £200,000.
-
ClosedSmall-firm friendly
Rowley Way Estate Better Homes Works
Camden is inviting tenders for refurbishment of 66 dwellings at Rowley Way Estate to the Camden Home Standard. The work includes new kitchens and bathrooms, electrical upgrades, asbestos removal, joinery repairs, and interior finishes, delivered under a Heritage Partnership Agreement.
-
ClosedSmall-firm friendly
FIRE ALARM AND DETECTION WORKS (The Lindales)
London Borough of Haringey needs to install a wireless L5 fire alarm system at The Lindales, including smoke alarms in stairwells, heat detectors in flat hallways and rooms with external-facing windows, following Fire Risk Assessment recommendations.