Contracts
Construction & building works in North West
Public sector contract notices in construction & building works covering North West, from Find a Tender and Contracts Finder.
Construction & building works notices in North West
-
Small-firm friendly
Green Ayre Skate Park
Lancaster City Council wants a new skatepark built at Green Ayre, including design and construction. The contract covers the full design and build delivery of the facility.
-
Small-firm friendly
Design and build of skatepark expansion & climbing wall
Lancaster City Council wants a contractor to design and build an expansion to the skatepark at Green Ayre and add a climbing wall. The work is fixed-price at £350k.
-
Small-firm friendly
Manchester International Airport Phase 2 - Overbridge Civils
Kier Transportation is seeking a contractor for civil engineering work on an overbridge as part of Manchester Airport station expansion to accommodate longer trains. The work is part of platform remodelling to enable longer 144m train services.
-
Small-firm friendly
Refurbishment of Leigh Market Hall
Wigan Council is appointing a contractor to refurbish Leigh Market Hall, including roof and building services upgrades, new entrance, public toilets, and internal reconfiguration. The contractor will be responsible for completing a RIBA Stage 4 design pack and delivering all construction works.
-
Small-firm friendly
Bolton Urban Cricket Centre
Bolton Council is seeking a design and build contractor for a five-lane covered cricket dome at Ladybridge High School with associated landscaping. The tender covers full design and delivery through RIBA Stages 1-6, but initial appointment will be for design stages only (Stages 1-3).
-
Small-firm friendlyFramework
Domestic Build Works (Disability Adaptations)
Cheshire East Council is establishing a four-lot framework for domestic building works to support disability adaptations. Work includes building alterations, external works, roofing, kitchens, bathrooms, and related trades across South and East Cheshire.
-
Framework
Electrical Works Framework
Liverpool City Region Combined Authority is establishing a closed two-lot framework for electrical works across its estate over 48 months. Lot 1 covers minor works (one supplier awarded); Lot 2 covers major works (five suppliers awarded).
-
DNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV
Strip-out, enabling works and waste management at the Windscale Advanced Gas-cooled Reactor (WAGR) facility at Sellafield. The work includes removal of fixtures, fittings and equipment, radiological waste handling, and support for wider decommissioning programmes.
-
Small-firm friendly
Footway Slurry Seal 2027
Wigan Council wants footway slurry seal applied across various locations in the Wigan Borough. This is a £1m construction contract for surface treatment work on pedestrian pavements.
-
Small-firm friendly
Carriageway Micro Asphalt and Pre-Patching 2027
Wigan Council wants micro asphalt and pre-patching work on roads across the borough. The work is planned for 2027.
-
Framework
Technical and Highways Works Framework
Salford City Council is establishing an open framework to deliver technical and highways works over several years. The framework has an estimated total value of £300m and will reopen for new suppliers at years 3 and 6.
-
Small-firm friendly
Lumb Lane Play Area
Stockport Metropolitan Borough Council is seeking contractors to improve the Lumb Lane play area, including installation of play equipment and safer surface. The work is estimated at £98,000.
-
Small-firm friendly
4 John Street, Maryport - Lintel Replacement and Rendering
Replace a rotten timber lintel with steel or concrete at a conservation area property in Maryport. Includes lime stucco render renewal to the front elevation.
-
Jigsaw Homes Group - Window and door replacement program 2027-2030
Jigsaw Homes Group is seeking contractors for a four-year window and door replacement programme across their housing stock. The work runs from 2027 to 2030 with a contract value of £10.8m.
-
Small-firm friendly
Resurfacing of Church Car Park - Church Street, Audley
Removal and resurfacing of a car park at Church Street, Audley. The work includes stripping the existing surface and laying new material.
-
Small-firm friendly
Highways - A8 In-Situ recycling patching works
Wirral Council wants in-situ recycling patching works on the A8 - a technique that recycles existing asphalt without traditional excavation or planing. The work delivers a thermal bond repair suitable for all asphalt types.
-
Small-firm friendlyFramework
Quarrying - North District
Forestry Commission needs drilling, blasting, extraction and processing of hard rock aggregate at multiple quarry sites in northern England. Material is used for constructing and maintaining forest roads, with work typically occurring over a few weeks each year.
-
Small-firm friendly
DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JV
Controlled demolition of the B55 Office Complex and B55.2 Turbine Hall at Sellafield's WAGR site, including soft stripping, asbestos remediation, structural frame removal, and waste processing. The work must protect an operational substation and retain basements within the structures.
-
Small-firm friendly
Kingsway Tunnel - Asbestos Insulating Board (AIB) 'Dado' Panels Removal
Merseytravel wants licensed asbestos removal contractors to strip AIB backed dado cladding panels from both tubes of the Kingsway Tunnel, including removal of brackets, fixings and cables behind the panels, followed by decontamination and cleaning.
-
Small-firm friendly
MRI – PET Scanner Chiller Replacement
Manchester University NHS Foundation Trust needs to replace an aged chiller unit serving an MRI-PET scanner. This is mechanical equipment replacement within a hospital setting.
-
Small-firm friendly
The Supply of Commercial Refrigeration and Freezer Equipment
Lancashire County Council is renewing its contract for supply and delivery of commercial refrigeration and freezer equipment used in schools, colleges and council buildings. The contract covers both supply and installation of the equipment.
-
Small-firm friendly
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Blackpool Borough Council is seeking a contractor to carry out structural repairs to Blackpool Tower during a planned closure from November 2026 to March 2027, followed by further work during the summer operating season from April to November 2027. Additional ad-hoc maintenance will be needed beyond November 2027 based on annual inspections.
-
Framework
Planned & Capital Works Framework
Burnley Borough Council is establishing a four-year framework for planned, structural and capital works across its estate. They will appoint multiple contractors across five lots covering general and structural work, historical buildings, mechanical works, electrical works, and external works/groundworks.
-
Small-firm friendlyFramework
Repairs & Maintenance Framework
Burnley Borough Council is establishing a four-year framework for reactive repairs and maintenance across its property portfolio. Work covers 11 general fabric lots and 7 specialist trade lots, from low-value building works through to electrical, heating, and fire systems.
-
Small-firm friendly
Construction of a concrete wheeled sports facility at The Carrs Park, Wilmslow, SK9 4AA
Cheshire East Council needs a contractor to build a concrete wheeled sports facility to replace a steel one that was removed due to corrosion. The work is at The Carrs Park in Wilmslow and will be procured under a JCT Minor Works Contract with Contractors Design (2024 version).