Construction & building works in North West
Public sector contract notices in construction & building works covering North West, from Find a Tender.
SortClosing soonestLargest valueA to Z
Construction & building works notices in North West
-
Closed
Provision, Installation and Operation of Christmas Attractions in Albert Square Manchester
Manchester City Council wants a supplier to provide, install and operate a Christmas attraction in Albert Square from 2026 onwards. The core offer must include an ice rink, food and beverage services, and family-friendly festive installations, running seven days a week from November to early January.
-
ClosedSmall-firm friendly
Planned Maintenance 2026
Cobalt Housing wants two contractors to handle planned maintenance and reinvestment works across their Liverpool housing stock. Work includes external repairs, window and door replacement, roofing, kitchen and bathroom renewals, electrical installation, and responsive maintenance on void properties.
-
ClosedSmall-firm friendly
Withy Grove Park and Car Park Improvements
South Ribble Borough Council wants main entrance alterations and park improvement works at Withy Grove Park in Bamber Bridge. Work includes changes to the entrance area and general park enhancements.
-
ClosedSmall-firm friendly
Aseptic Unit Re-Development at Arrowe Park Hospital
Wirral University Teaching Hospital needs a complete redesign and build of its pharmacy aseptic unit to comply with MHRA Manufacturer's Specials Licence requirements. The unit will use pharmaceutical isolators for sterile medicine compounding.
-
ClosedSmall-firm friendly
Kingsway Tunnel Embankment Stabilisation - Outbound Road
Merseytravel needs a specialist contractor for early involvement, design, and installation of slope stabilisation measures (drapery mesh and rockfall netting) on the A59 Kingsway Tunnel approach road outbound embankment, plus a variable messaging sign structure. Work also includes remedial repairs to existing mesh on the inbound carriageway.
-
ClosedSmall-firm friendly
Carriageway Resurfacing and Footway Works 2026/27 - Bulk Tender 1
Wigan Council wants carriageway and footway resurfacing across multiple locations in the borough. This is a bulk tender for work in 2026/27.
-
ClosedSmall-firm friendly
Playing Field Improvement Works at Ashfield Park and Southlands Recreation Ground, Standish, Wigan
Playing field improvement works at two recreation grounds in Standish, Wigan. The contract covers drainage, landscaping, and surface works at Ashfield Park and Southlands Recreation Ground.
-
ClosedSmall-firm friendly
Lift Maintenance and upgrades
Lancaster City Council needs maintenance and upgrades to lifts across its council properties. The notice gives no detail on scope, number of properties, or contract term.
-
ClosedSmall-firm friendly
Improvement Works to Clitheroe Castle Grounds
Ribble Valley Borough Council is improving Clitheroe Castle grounds with new footpaths, seating, bins, bollards, amenity lighting, and a reconstructed bandstand arena. The work is a single contract worth £850,000.
-
ClosedSmall-firm friendly
Stadt Moers Park Methane Stripping Plant Upgrade Works
Knowsley Council wants to upgrade the methane stripping plant at Stadt Moers Park landfill site, which treats leachate before discharge to sewer. The new system must reliably meet discharge consent conditions over a 25-year design life with lower maintenance demands than the current 2005/6 plant.
-
ClosedSmall-firm friendly
Soft Landscaping for Haslingden Big Lamp Public Realm
Rossendale Borough Council needs soft landscaping works for a public realm improvement scheme at Haslingden Big Lamp. The work includes tree planting, rain gardens or sustainable drainage features, and biodiversity planting to complement the streetscape and Conservation Area setting.
-
ClosedFramework
Highways Works Framework Stage 1 - Conditions of Participation
Bury Council is establishing a four-year highways works framework covering maintenance, surfacing, street lighting, civil engineering, and inspection services. Suppliers can bid for one or more of nine lots.
-
ClosedSmall-firm friendly
Mainway Play Area Installation, Rochdale
Supply and installation of a new play area to replace an end-of-life facility off Mainway in Middleton. Also includes a tarmac access path and chicane at the junction with Mainway.
-
ClosedSmall-firm friendly
Lease Opportunity - Padel Courts, Blackpool Sports Centre, Stanley Park
Blackpool Council is offering a ground lease to construct and operate padel courts at Stanley Park Sports Centre. The lease opportunity is valued at £3m.
-
ClosedSmall-firm friendly
Maxwell Building 8th Floor Remediation Project
The University of Salford is removing asbestos-containing materials from ceiling voids on the 8th floor of Maxwell Building, then carrying out environmental cleaning, replacing suspended ceilings, new floor finishes, corridor doors, and lighting upgrades. They will appoint a single Principal Contractor for all works.
-
ClosedSmall-firm friendly
Refurbishment Works at Princess Street Offices
Workington Town Council needs refurbishment work on its Princess Street office building, including structural walls, door and window openings, roofing with bitumen system and rooflights, and internal finishes.
-
ClosedSmall-firm friendly
Landlord Strip Out Works, 101/103 St. James Street, Burnley
Remove existing tenant shop fit, test and commission services, and make good a stepped concrete plinth to create a level floor at a shopping centre unit in Burnley. Works follow existing specification documents and take 6–8 weeks from March 2026.
-
ClosedSmall-firm friendly
Property Refurbishment to 66 Caernarvon Ave BB12 6BD
Burnley Borough Council wants full refurbishment of a single residential property including roof, windows, gutters, wiring, plastering, kitchen extension and external work. The job runs 12 weeks from mid-March 2026, though dates are flexible depending on weather.
-
ClosedSmall-firm friendly
Minor Adaptations for People with Disabilities
Cumberland Council wants a contractor to supply and install minor adaptations to homes for disabled people, following NHS or council assessments or on a preventative basis. The initial 12-month contract is worth £384,000 with an optional 12-month extension.
-
ClosedSmall-firm friendly
Salmesbury Waste Water Pumping System Construction
Design and build a new foul water pumping station and 2,750m rising main for Samlesbury Enterprise Zone, with 12 months' planned maintenance. The work must meet United Utilities standards and gain their approval, plus Highway Authority consent for the rising main.
-
ClosedSmall-firm friendly
VAUGHAN HOUSE CSIP REFURBISHMENT WORKS
Refurbishment works at Vaughan House. The notice does not specify the scope, scale, or nature of the CSIP works beyond the title.
-
ClosedSmall-firm friendlyFramework
Liquid Waste Removal and Drainage Services
Northern Trains needs a supplier to remove liquid waste from train maintenance depots - coolant, oil, sludge from separators, and septic tank contents - plus drain jetting, clearance and CCTV across 11 current sites. They want to establish a framework agreement for call-off.
-
ClosedSmall-firm friendly
Working at Height & Lightning Protection
PfP is seeking suppliers for servicing, maintenance and installation of working at height equipment and lightning protection systems across the UK. The contract is split into eight lots covering national, regional and Scotland-specific coverage.
-
ClosedSmall-firm friendly
Delivery of Decarbonisation Works at Marl Pits Leisure Centre, Rawtenstall
Rossendale Borough Council needs a contractor to deliver heat decarbonisation and energy-efficiency works at Marl Pits Leisure Centre. The project involves installing new plant, mechanical and electrical systems, building fabric improvements, and testing/commissioning to replace fossil-fuel systems by end January 2027.
-
ClosedSmall-firm friendly
SSA & Conference - Mechanical
Replace gas-fired heating and hot water systems with electric air source heat pumps at two university buildings on the same campus. Work includes removal of existing systems and installation of ASHP and point-of-use electric heaters.