Construction & building works in North West
Public sector contract notices in construction & building works covering North West, from Find a Tender.
Construction & building works notices in North West
-
ClosedSmall-firm friendly
Roofing Works at Baldwin Court
Roofing works at Baldwin Court. No further detail is provided in the notice.
-
ClosedSmall-firm friendly
DLO Support
Progress Housing Group wants a contractor to support their in-house DLO team with specialist repairs and maintenance across multiple workstreams including brickwork, structural work, M&E compliance, adaptations, tree surgery, and emergency out-of-hours callouts. The work spans various property types and requires availability for emergency repairs.
-
ClosedSmall-firm friendly
Provision of Traffic Signs
St Helens Council wants supply, installation and maintenance of traffic signs, street nameplates, bollards, noticeboards and bespoke signage across council highways and owned sites. The work includes cleaning, replacement and removal as needed.
-
ClosedSmall-firm friendly
Co-op Academy Medlock - Toilet Refurbishment
Design and refurbishment of toilets at Co-op Academy Medlock in Manchester city centre. The buyer is an academy trust.
-
ClosedSmall-firm friendly
Property Refurbishments- 49 Albion Street, Burnley BB11 4QD
Full refurbishment of a residential property at 49 Albion Street, Burnley, including pointing, gutters, sandblasting, roofing, kitchen extension, plastering and rewiring. Work runs 12 weeks from early June to end August 2026, subject to weather and agreement on final dates.
-
Closed
The Appointment of a Specialist Engineering Contractor to develop under an ECI period the detailed remedial works to 8 Ventilation Stations across the Mersey Tunnels Estate and carry out those remedial works
Merseytravel is seeking a specialist engineering contractor to design and then execute remedial works to 8 ventilation stations across the Mersey Tunnels (Kingsway and Queensway). The work involves significant structural and architectural refurbishment of Grade II listed buildings, with an Early Contractor Involvement phase for detailed design followed by construction.
-
ClosedFramework
Services-Framework-Mechanical Services(1)
United Utilities is establishing a four-year framework for mechanical services maintenance across their water and wastewater assets. Work covers repairs, machining, welding, fabrication, gearbox overhaul, screens and handling equipment repair, and supply of fabricated parts.
-
ClosedSmall-firm friendly
Alexandra Park Boathouse Café Toilet Refurbishment, Queens Road, Oldham OL8 2AX
Refurbishment of public lavatories at Alexandra Park Boathouse Café, including reconfiguring the entrance from external to internal (via the café), and stripping out and reinstalling electrical, heating, ventilation and water services.
-
ClosedSmall-firm friendly
Replacement Smoke Alarms 2026
Lancaster City Council needs replacement smoke detection systems fitted to council-owned residential properties across the district. The work is scheduled for 2026.
-
ClosedSmall-firm friendly
Yew Tree Community School - Boilers and BMS Panel Replacement (Five of five school summer shutdown projects)
Supply, install, test and commission a new boiler and electrical BMS panel at Yew Tree Community School. This is one of five summer shutdown projects at the school.
-
ClosedSmall-firm friendly
Woodhouses Voluntary Controlled Primary School - Boilers and BMS Panel Replacement (Four of five school summer shutdown projects)
Supply, install, test and commission boilers and mechanical plantroom equipment plus an electrical BMS (building management system) panel at Woodhouses Voluntary Controlled Primary School.
-
ClosedSmall-firm friendly
Limehurst Community Primary School - Boilers and BMS Panel Replacement (Three of five school summer shutdown projects)
Supply, installation, testing and commissioning of boilers and a Building Management System panel at Limehurst Community Primary School. This is one of five summer shutdown projects at the school.
-
ClosedSmall-firm friendly
Burnley Brow Community Primary School - Boilers and BMS Panel Replacement (Two of five school summer shutdown projects)
Supply, install, test and commission boilers and a BMS control panel at Burnley Brow Community Primary School. This is one of five school summer shutdown projects.
-
ClosedSmall-firm friendly
Beever Primary School - Boilers and BMS Panel Replacement (One of five school summer shutdown projects)
Supply, installation, testing and commissioning of boilers and a Building Management System panel at Beever Primary School. This is one of five planned school summer shutdown projects.
-
ClosedSmall-firm friendly
Tabley Active Travel Path
Knutsford Town Council wants a 170m active travel path built on a field connecting Tabley Road to a housing development. The path should be 2m wide with post and rail fencing on both sides and a gated entrance.
-
ClosedSmall-firm friendly
Dog Wood Cycle Path Design
Knutsford Town Council wants pre-tendering design work for a cycle path connecting Church Walk to Parkgate Lane via Dog Wood and Tatton Park. The work includes topographical survey, ground investigations, tree surveys, ecology reports, and historic landscape impact assessment.
-
ClosedSmall-firm friendly
For the Provision of: Drainage & Water Main Day to Day Repairs
First Choice Homes Oldham need a contractor for day-to-day drainage and water mains repairs, including CCTV surveys, soil investigations, and pipe replacements. This is a £1m contract.
-
ClosedSmall-firm friendly
TfGM Landscaping Services 2026
TfGM needs landscaping services across 60 sites in Greater Manchester, including grass cutting, hedge and shrub maintenance, weed control, hard-surface cleaning, litter removal, arboriculture, seasonal planting and general upkeep. The contract runs for three years with two optional one-year extensions.
-
ClosedSmall-firm friendly
ELECTRICAL REWIRE (PHASE 2) AT WHITTAKER MOSS PRIMARY SCHOOL, ROCHDALE
Electrical rewiring and strip-out works at Whittaker Moss Primary School in Rochdale. Works include builders work, testing, commissioning, and O&M manuals, to be completed during summer holiday breaks.
-
ClosedSmall-firm friendly
11v11 3G Pitch for Co-op Academy Swinton
Design and build a new 11-a-side 3G artificial pitch with electrical infrastructure prepared for future floodlight installation at Co-op Academy Swinton.
-
ClosedFramework
NORTH WEST CONSTRUCTION HUB - HIGH VALUE CONSTRUCTION FRAMEWORK (2027 TO 2031) TC621 / P1007
Manchester City Council is establishing a four-year construction framework (2027–2031) for new-build, demolition, refurbishment and civil engineering work on council-owned or used properties. The framework will be divided into lots with multiple suppliers appointed.
-
ClosedSmall-firm friendly
Alkrington Primary School – Roofing Refurbishment Works
Refurbishment of multiple pitched and flat roofs at Alkrington Primary School, including re-pointing, parapet encapsulation, and internal plaster repairs. Work covers five roof sections with felt repairs and structural updates.
-
ClosedSmall-firm friendly
Renovation of Helmsdale Play Area in Birch Green, Skelmersdale
West Lancashire Borough Council wants a specialist play equipment contractor to design, supply, and install a new inclusive play area for children aged 5–12 at Helmsdale, Birch Green, Skelmersdale. The contractor will also remove existing infrastructure and surfacing, and handle landscaping and handover.
-
ClosedFramework
BwDBC Surfacing and Civils Framework 2026
Blackburn with Darwen is establishing a four-lot framework for highway maintenance work: surfacing, civils, cold milling, and asphalt repairs. The framework runs to 2026 with a total value of £50 million.
-
ClosedSmall-firm friendly
Rakehead Recreation Ground, Burnley - Playing Field Reinstatement
Remove a temporary car park (stone surface and solar lighting) from Rakehead Recreation Ground and restore it as a grassed playing field, including topsoil spreading and bituminous footpath repair.