Construction & building works with no stated region
Public sector contract notices in construction & building works that don't say where the work is, from Find a Tender and Contracts Finder.
Construction & building works notices with no stated region
-
Small-firm friendly
BLD-3163 Store 54 Independent Heating Solution - Delivery
KBS Maritime Ltd wants a contractor to design and install a complete heating solution for Store 54, including VRV/VRF and air source heat pump systems. The work also covers roof repair and insulation, glazing, doors, electrical upgrades to ATEX/DSEAR standards, and new lighting.
-
DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
Supply up to 30 FTE staff for nuclear facility decommissioning operations inside controlled areas. Work includes waste handling, plant removal, and size reduction, growing in complexity over time.
-
Small-firm friendly
DBB Blockhouse LV distribution installation
Installation of low-voltage distribution equipment in the DBB Blockhouse, including a distribution board, isolation transformers, cabling, earthing, and testing. The work runs from an existing automatic transfer switch to a power distribution unit.
-
Framework
Dynamic Purchasing System for Commercial Retrofit
Procure Plus is establishing a dynamic purchasing system for commercial retrofit consultancy and works available to the wider public sector. The DPS will run until 2029.
-
Framework
YPO - 001087 Low Energy Lighting Systems to Include Internal, External and Emergency Lighting
YPO is establishing a Dynamic Purchasing System (DPS) for the supply of low energy lighting systems including internal, external and emergency lighting. The DPS will serve all UK public sector organisations and YPO's internal needs.
-
Framework
YPO - 000880 Building Envelope Services
YPO is establishing a Dynamic Purchasing System for building envelope services to serve all public sector organisations. Suppliers can apply throughout the framework period to be appointed for work including design, installation, maintenance and repair of building facades and related work.
-
Small-firm friendlyFramework
RA359924 - Dynamic Market - Surfacing Works
LondonEnergy Ltd is establishing a Dynamic Market (framework) for surfacing, resurfacing and associated civils works across their sites. Work will be competed and awarded on an as-required basis through the framework.
-
ClosedSmall-firm friendly
RA353266 - Site Civil Assets Inspection
LondonEnergy Limited needs a comprehensive inspection of 46 civil assets including energy recovery plants, recycling centres, buildings, bridges and ramps. You'll produce a condition assessment for each asset, a maintenance plan, and proposed inspection regime based on RICS Planned Preventative Maintenance guidance.
-
ClosedSmall-firm friendly
Remediation of Blackdog Ranges Prior to Disposal
The Ministry of Defence wants remediation work on the Blackdog Ranges site before it is disposed of. No further detail on the scope of work is given in the notice.
-
ClosedSmall-firm friendly
CAMR01 Post Lazurite Reinstatement Asset Package (Relocation of boiler room)
The Ministry of Defence needs a boiler room relocated from basement to ground floor in an old kitchen area at a site called CAMR01. This is part of post-Lazurite reinstatement work.
-
ClosedSmall-firm friendly
FAS/EM Lighting Faults - 23/24, Tel Aviv, Israel
FCDO Services is replacing the fire alarm system at the Ambassador's Residence in Tel Aviv, Israel. The work is described as a lighting fault correction under a 2023-24 contract framework.
-
ClosedSmall-firm friendly
RA354085 - Concrete Platform Slab Repair
LondonEnergy needs investigation and repair of a concrete platform slab with impact damage. A full inspection report is available to guide the work.
-
ClosedSmall-firm friendly
CAMR01 Post Lazurite Reinstatement Asset Package 1,2,3,4
Ministry of Defence needs adaptation removal, deep cleaning, decoration preparation and redecoration, plus floor covering replacement across four asset packages. This is post-project reinstatement work.
-
ClosedSmall-firm friendly
Bridgetown Door works 25/26, Barbados
FCDO Services is replacing single, double, and aluminium fire doors at the British High Commission in Bridgetown, Barbados. The work includes door frame installation.
-
ClosedSmall-firm friendly
Project Tullie Phase 3: Main Contractor Services ITT
Tullie House Museum needs a main contractor for Phase 3 of their project: extending ground floor storage and refurbishing ground and first floor areas to create new gallery and learning spaces. The work is at their existing museum building.
-
ClosedSmall-firm friendly
Abu Dhabi Electrical Works-25/26-UK
FCDO Services needs electrical remedial works on compound properties in Abu Dhabi, covering residential and facilities buildings. The scope is not detailed beyond that in the notice.
-
ClosedSmall-firm friendly
Slab Track Installation copy
Ferrovial BAM Rail Systems is looking for subcontractors to install open route track slab for HS2's Lot 3 North and Lot 2 Central projects. The contract is valued at £5 million.
-
ClosedSmall-firm friendly
Request for Tender
Design, supply and install a raised trackway and a bridleway bridge across the West Glen River. Both works must be completed by end of April 2026.
-
ClosedSmall-firm friendly
Refurbishment and building works
Conversion of a first-floor space into a 2-bedroom flat and conversion of a rear building into a 1-bedroom dwelling. Work is at 105 Kenwyn Street.
-
ClosedSmall-firm friendly
Semi-Comprehensive Maintenance Program for Heating Ventilation Air-Conditioning system across India network
The FCDO wants a contractor to maintain HVAC systems across seven British High Commission and Deputy High Commission offices in India. The work covers routine and corrective maintenance for chillers, VRV systems, cooling towers, and air conditioning units.
-
ClosedSmall-firm friendly
A66 - FRC
Balfour Beatty is seeking reinforced concrete work on the A66 scheme, covering abutments, wing walls, central pier, precast deck panels, and parapets. The package includes temporary works design, falsework, concrete testing, and all labour and materials to complete the structure.
-
ClosedSmall-firm friendly
Central Substation RIBA4 & Build
KBS Maritime requires design development (RIBA Stage 4 technical design) and construction of a new Central Substation building. The work is split into design and build phases, excluding electrical switchgear installation.
-
ClosedSmall-firm friendly
CA17268 - Maiden Erlegh Trust Student Washroom Refurbishment Works
Maiden Erlegh Trust wants a supplier to carry out washroom refurbishment services across their schools. The contract runs for up to three years.
-
ClosedSmall-firm friendly
Specialist Consultancy - Review and Impact Assessment of Railway Survey Standard
FBRS JV needs a specialist to review the updated Railway Survey Standard Revision P02 and assess its practical impact on survey methodology, resourcing, programme and delivery across three rail system lots. The work involves a technical review, preparation of clarification queries, and a full impact assessment.
-
ClosedFramework
Kier Infrastructure - Ground Investigation
Kier Infrastructure is establishing a supply chain for 1000-1500 exploratory boreholes and associated ground investigation work including cable percussion boring, rotary drilling, dynamic sampling, coring, pitting and trenching to support design and Environmental Impact Assessment.