Solar PV Installation at Sedbergh Pool/Leisure Centre, Bowling Pool and Ilkley Lido
Bradford Council wants design, supply, installation and commissioning of roof-mounted solar PV systems across three leisure centres: Sedbergh Pool (200 kW), Bowling Pool (120 kW), and Ilkley Lido (80 kW). Work must be substantially complete by 31 March 2026.
- Closed6 February 2026
- Value£440k
- Per lot£147k across 3 lots
- BuyerCity of Bradford Metropolitan District Council
- Wherethree leisure centres in Bradford and Ilkley
- CategoryConstruction & building works
- RegionYorkshire & Humber
You'll want to look if you design and install grid-connected solar systems on commercial and leisure buildings and can manage structural surveys, DNO approvals and full commissioning within a tight March 2026 deadline
You'll need
- Structural roof surveys including load and wind uplift assessment
- DNO applications and approvals managed with Northern Powergrid
- Systems configured for on-site consumption only
- Bird protection measures required