BCU-ITT-61955 YMH DATACENTRE PROJECT
Design, supply, install, test and commission a modular external data centre with six 48U cabinets, including power distribution, cooling, fire suppression, and environmental monitoring. A complete turnkey solution for a health board's critical infrastructure.
- Closed18 March 2026
- Value£400k
- BuyerBetsi Cadwaladr University Health Board
- WhereBetsi Cadwaladr University Health Board, Wales
- CategoryIT, software & telecoms, Construction & building works, Surveying, architecture & engineering
- RegionWales
You'll want to look if you design and build modular data centres with experience in healthcare infrastructure, power systems (UPS, standby generation), precision cooling, and fire suppression integration
You'll need
- Design must comply with BCUHB technical specifications
- LPS 1175 SR2 shell standard
- Full commissioning and testing capability required