London Gateway - Second Rail Terminal Phase 2
DP World is building a second rail terminal at London Gateway Port with five new sidings and 21 switches and crossings to expand freight capacity. The works include permanent way installation to integrate the new terminal with the existing rail network.
- ClosesNot stated
- Value£15m
- BuyerLONDON GATEWAY PORT LIMITED
- WhereStanford le Hope, London Gateway Port
- CategoryConstruction & building works
- RegionEast of England
You'll want to look if you have experience in railway permanent way construction, track laying, and switches and crossings installation, ideally on ports or logistics sites
Might not suit a small firm
- the contract itself is a large one