4.8MW Substation design and installation
Design and construct a 4.8 MW substation on the island of Eday, Orkney. The work covers both engineering design and on-site installation.
- Closed26 June 2026
- Value£1.6m
- BuyerEuropean Marine Energy Centre (EMEC) Ltd
- WhereEday, Orkney
- CategoryConstruction & building works, Surveying, architecture & engineering
- RegionScotland
You'll want to look if you have experience designing and building electrical substations, particularly in remote or island locations