Anchorage A-Frames Replacement Scheme
The Humber Bridge Board is seeking a contractor to design and replace the A-frame rocker bearings on the Hessle and Barton anchorages of the Humber Bridge. The work involves developing a conceptual design into detailed design and construction, replacing existing A-frames with vertically orientated pendels and a wind shoe.
- Closed20 July 2026
- Value£8.0m
- BuyerHumber Bridge Board
- WhereHessle and Barton anchorages, Humber Bridge
- CategoryConstruction & building works, Surveying, architecture & engineering
- RegionEast of England
You'll want to look if you have bridge engineering and construction expertise, particularly in major structural replacements and bearing systems, and can handle design-and-build delivery on a significant infrastructure project
Might not suit a small firm
- the contract itself is a large one
Possible incumbent
Roughan & O'Donovan limited carried out principal inspection work on the Barton Anchorage in May 2026. Inferred from prior awards to this buyer, not confirmed.