Bidwire
Browse contracts
Closed

Anchorage A-Frames Replacement Scheme

The Humber Bridge Board is seeking a contractor to design and replace the A-frame rocker bearings on the Hessle and Barton anchorages of the Humber Bridge. The work involves developing a conceptual design into detailed design and construction, replacing existing A-frames with vertically orientated pendels and a wind shoe.

You'll want to look if you have bridge engineering and construction expertise, particularly in major structural replacements and bearing systems, and can handle design-and-build delivery on a significant infrastructure project

  • the contract itself is a large one

Roughan & O'Donovan limited carried out principal inspection work on the Barton Anchorage in May 2026. Inferred from prior awards to this buyer, not confirmed.

View on Find a Tender → (opens in a new tab)