Bidwire
Browse contracts
ClosedSmall-firm friendly

New Century Park Path Resurfacing

Fair Oak & Horton Heath Parish Council wants to resurface a path: remove gravel, excavate root-heaved areas, and install new surface with wooden edgings if suitable. The path is approximately 670m long by 1.5m wide.

You'll want to look if you do groundworks and path construction or can take on a design-and-build footpath project

View on Find a Tender → (opens in a new tab)