Bidwire
Browse contracts
ClosedSmall-firm friendly

Development of a network of hydrological monitoring across the Long Term Monitoring Network: North Solent

Natural England needs a hydrological conceptual model for North Solent NNR and advice on where to install dipwells to monitor water levels near existing vegetation plots. The work is mostly desk-based using existing data, with a possible site visit.

You'll want to look if you have experience in hydrological assessment and can produce conceptual models for wetland or coastal sites, ideally with knowledge of dipwell network design

JBA Consulting Limited won a related water level control structures investigation at another Natural England site in October 2025. Inferred from prior awards to this buyer, not confirmed.

View on Find a Tender → (opens in a new tab)