Nant y Mwyn 25-26 Scour Protection Works
Prevent erosion of metal-rich spoil heaps along the Nant y Bai watercourse by installing rock-filled bags, geotextile matting, wooden stakes, and slope stabilisation measures. Work includes silt traps, an overland pipe system, and translocation of Purple Moor grass.
- Closed5 December 2025
- Value£100k
- BuyerMining Remediation Authority
- WhereNant y Mwyn site, Wales
- CategoryConstruction & building works
- RegionWales
You'll want to look if you have experience in riverbank stabilisation, spoil management, or remedial earthworks, and can work within environmental and ecological constraints
You'll need
- Must work within ecological constraints and coordinate with ecological supervisor
- Ability to transport materials along designated routes with minimal ecological impact
- Potential need for helicopter access to site