Nant y Mwyn 25-26 Scour Protection Works

Prevent erosion of metal-rich spoil heaps along the Nant y Bai watercourse by installing rock-filled bags, geotextile matting, wooden stakes, and slope stabilisation measures. Work includes silt traps, an overland pipe system, and translocation of Purple Moor grass.

You'll want to look if you have experience in riverbank stabilisation, spoil management, or remedial earthworks, and can work within environmental and ecological constraints

  • Must work within ecological constraints and coordinate with ecological supervisor
  • Ability to transport materials along designated routes with minimal ecological impact
  • Potential need for helicopter access to site