Generator Connection Point
Install a generator connection point on the outside wall of NLB Oban Base, with cabling routed to the switchboard. Reconfigure an existing 400A breaker in the LV switchboard to accept generator input.
- Closed17 December 2025
- Value£35k
- BuyerNorthern Lighthouse Board
- WhereNLB Oban Base
- CategoryConstruction & building works
- RegionScotland
You'll want to look if you carry out electrical installation work and can attend a site visit in Oban on 4 December 2025.
You'll need
- mandatory site visit attendance on 4 December 2025