ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
Civil works to replace a fumigation lobby in an ISO11 biocontainment facility, including strip-out of existing equipment, temporary biocontainment wall construction, and associated building modifications. The supplier will also act as CDM Principal Designer/Principal Contractor and convert structural drawings to construction drawings.
- Closes23 September 2026
- Value£154k
- BuyerTHE PIRBRIGHT INSTITUTE
- WhereThe Pirbright Institute facility
- CategorySurveying, architecture & engineering, Business & professional services, Construction & building works
- RegionSouth East
You'll want to look if you have CDM Principal Designer and Principal Contractor qualifications and experience with laboratory or biocontainment facility construction
You'll need
- CDM Principal Designer competence
- CDM Principal Contractor competence
- experience with biocontainment/cleanroom standards
Possible incumbent
Grationeer Ltd won the project management role in May 2026. Inferred from prior awards to this buyer, not confirmed.