ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU) - Retender
Design, build, install and qualify a fumigation lobby and dedicated air handling unit for an ISO11 animal facility. Work includes detailed design with HAZOP attendance, factory build and testing, delivery, on-site installation and operational qualification.
- Closes13 November 2026, 12 noon
- Published2 October 2026
- Value£152k
- BuyerTHE PIRBRIGHT INSTITUTE
- WherePirbright, Surrey; factory build at supplier's premises
- CategoryConstruction & building works, Cleaning, waste & environmental, Furniture, equipment & supplies, Surveying, architecture & engineering
- RegionSouth East
You'll want to look if you design and build specialist ventilation systems for laboratory or animal research facilities, and can manage subcontractors through factory build, delivery and on-site installation stages.
You'll need
- HAZOP study attendance and design integration
- Factory Acceptance Test capability
- Site Acceptance Test capability
- CDM compliance (as subcontractor to Principal Contractor)
Possible incumbent
Grationeer Ltd acted as project manager for the ISO11 fumigation lobby replacement project (awarded May 2026). Inferred from prior awards to this buyer, not confirmed.