Contracts
Small-firm friendly
ITT - Swindon Archive Decarbonisation Design Team (UID 320)
Historic England wants a multidisciplinary design team to take their Swindon Archive building through RIBA Stage 3, working up detailed designs for decarbonisation and building services replacement. Stage 4 (technical design) may follow if stage 3 is satisfactory.
- ClosesNot stated
- Published9 October 2026
- Value£149k
- BuyerHistoric England
- WhereSwindon
- CategorySurveying, architecture & engineering, Construction & building works
- RegionSouth West
You'll want to look if you're an architectural practice or multidisciplinary team with heritage building and decarbonisation experience, able to lead design development through RIBA Stage 3
You'll need
- RIBA Stage 2 feasibility study to be reviewed
- Multidisciplinary team capability
Possible incumbent
Architype completed Archive Decarbonisation Surveys and Reports (2025); Milton Keynes Surveys completed the Measured Building Survey (2026). Inferred from prior awards to this buyer, not confirmed.