Contracts

Small-firm friendly

ITT - Swindon Archive Decarbonisation Design Team (UID 320)

Historic England wants a multidisciplinary design team to take their Swindon Archive building through RIBA Stage 3, working up detailed designs for decarbonisation and building services replacement. Stage 4 (technical design) may follow if stage 3 is satisfactory.

You'll want to look if you're an architectural practice or multidisciplinary team with heritage building and decarbonisation experience, able to lead design development through RIBA Stage 3

  • RIBA Stage 2 feasibility study to be reviewed
  • Multidisciplinary team capability

Architype completed Archive Decarbonisation Surveys and Reports (2025); Milton Keynes Surveys completed the Measured Building Survey (2026). Inferred from prior awards to this buyer, not confirmed.