Sizewell C - HR Monitoring (CRX & Building) Package
Design, supply, installation and commissioning of a structural health monitoring system for the Reactor Building and containment at Sizewell C nuclear power station. The system will track settlements, deformations, and structural integrity using over 200 embedded sensors throughout construction and operation.
- Closed10 April 2026, 17:00
- Published27 March 2026
- Value£5.0m
- BuyerSizewell C Limited
- WhereSizewell C, Suffolk
- CategorySurveying, architecture & engineering
- RegionEast of England
You'll want to look if you have experience designing and installing embedded structural monitoring systems, particularly for civil engineering projects, and can work with specialist sensors such as extensometers, inclinometers, and pressure transducers