Bidwire
UK public sector contracts
ClosedSmall-firm friendly

Swanley Recreation Ground Playground Replacement

Swanley Town Council wants to replace the playground at Swanley Recreation Ground with new equipment in a different location on the site. The work includes removing existing equipment and wetpour, installing a new wetpour safety surface to BS EN standards, and reinstating the old area with topsoil and seed.

You'll want to look if you design and install playground equipment with experience in wetpour surfaces and BS EN compliance.

  • BS EN 1176 compliance for playground equipment
  • BS EN 1177 and BS EN 7188 testing certification
  • Minimum 2-year guarantee on wetpour surface