EKFB NC2A - Transport and installation of precast tunnel segments

Transport and install five precast concrete tunnel segments for the Wendover Green Tunnel on the HS2 project using specialist Self-Propelled Modular Transporters (SPMTs), as traditional crane placement is blocked by two intersecting bridges. Segments weigh up to 43.6 tonnes and require lifting to approximately 12 metres high.

You'll want to look if you have experience moving and installing heavy precast concrete elements using SPMTs, particularly in constrained sites where conventional craning is not possible