Contracts
Building materials & structures in North West
Public sector contract notices in building materials & structures covering North West, from Find a Tender and Contracts Finder.
Building materials & structures notices in North West
-
ClosedSmall-firm friendly
Planned Preventative Maintenance
Northern Trains needs planned preventative maintenance on oil-water separators, tanks, bunds, and pipework across their Train Care Centres. The contract runs five years and covers compliance inspections, servicing, and thickness testing to environmental and safety standards.
-
ClosedSmall-firm friendly
Burnley Brow Community Primary School - Boilers and BMS Panel Replacement (Two of five school summer shutdown projects)
Supply, install, test and commission boilers and a BMS control panel at Burnley Brow Community Primary School. This is one of five school summer shutdown projects.
-
ClosedSmall-firm friendly
Limehurst Community Primary School - Boilers and BMS Panel Replacement (Three of five school summer shutdown projects)
Supply, installation, testing and commissioning of boilers and a Building Management System panel at Limehurst Community Primary School. This is one of five summer shutdown projects at the school.
-
ClosedSmall-firm friendly
Woodhouses Voluntary Controlled Primary School - Boilers and BMS Panel Replacement (Four of five school summer shutdown projects)
Supply, install, test and commission boilers and mechanical plantroom equipment plus an electrical BMS (building management system) panel at Woodhouses Voluntary Controlled Primary School.
-
ClosedSmall-firm friendly
Yew Tree Community School - Boilers and BMS Panel Replacement (Five of five school summer shutdown projects)
Supply, install, test and commission a new boiler and electrical BMS panel at Yew Tree Community School. This is one of five summer shutdown projects at the school.
-
ClosedSmall-firm friendly
Beever Primary School - Boilers and BMS Panel Replacement (One of five school summer shutdown projects)
Supply, installation, testing and commissioning of boilers and a Building Management System panel at Beever Primary School. This is one of five planned school summer shutdown projects.
-
ClosedFramework
PRO004980-Goods-Framework-The Supply of Ductile Iron Pipe and Associated Fittings
Framework agreement for the supply, delivery and installation support of ductile iron pipes and fittings in various sizes for water and wastewater applications. Material must meet water industry standards for potable water contact.
-
ClosedSmall-firm friendly
CCHA Trinity Court Fire Door Replacement Project 2026
Castles and Coasts Housing Association needs a contractor to replace 58 fire doors at Trinity Court sheltered housing in Whitehaven, including 30 flat entrance doors and 28 stairwell/corridor/storeroom doors. 16 of the flat entrance doors require new fire-rated GypWall shafts and repositioning work due to a compartmentation issue.
-
ClosedSmall-firm friendly
Alkrington Primary School – Roofing Refurbishment Works
Refurbishment of multiple pitched and flat roofs at Alkrington Primary School, including re-pointing, parapet encapsulation, and internal plaster repairs. Work covers five roof sections with felt repairs and structural updates.
-
ClosedSmall-firm friendly
Taxi Licensing Plates and Other Consumables
Warrington Borough Council needs a supplier to provide licensing plates, ID cards, signage, and consumables for hackney carriage and private hire vehicles and drivers across the borough. The supplier must offer 48-hour delivery, an online ordering portal, and a collection service for recycling used plates.
-
ClosedSmall-firm friendly
Waste Management Service
Halton Housing needs a waste management and recycling service to handle void waste, green waste and fly-tipping materials from their eight caged vehicles across Halton. The contract runs three years with optional two further one-year extensions.
-
ClosedFramework
PRO004993-Services-Framework-Water Efficiency Services
United Utilities is building a framework to deliver water efficiency services to domestic and business customers, including home and business audits, leak repairs, device installation, online surveys, and water-saving products. The work runs through 2026 and may involve multiple suppliers across various activities.
-
ClosedSmall-firm friendlyFramework
Bury Based Supplier List (BBSL)
Bury Council is building a supplier list (BBSL) for below-threshold procurements across 32 categories. Suppliers based in Bury or with substantive business operations there can apply to join.
-
ClosedSmall-firm friendly
LEGIONELLA RISK ASSESSMENT OF HOT & COLD WATER SYSTEMS
Legionella risk assessment across hot and cold water systems at Mersey and West Lancashire Teaching Hospitals NHS Trust sites. Work must follow BS 8580-1:2019 standard.
-
ClosedSmall-firm friendly
A66 Northern Trans-Pennine (NTP) - Scheme 1 & 2 Major Civils Works
Kier Transportation is looking for experienced civil contractors to deliver a full civils work package on the A66 Northern Trans-Pennine Scheme, covering earthworks, drainage, ducting and kerbing across multiple areas on Schemes 1 and 2.
-
ClosedFramework
PRO005060-Goods-Framework-The Supply of Polyethylene Pipe and Fittings
United Utilities is seeking manufacturers and suppliers of polyethylene pipes and fittings for water and wastewater applications. The framework will run for up to four years and cover supply, delivery, installation guidelines, testing and technical support.
-
ClosedSmall-firm friendly
Parcel Lockers
Cheshire West and Chester Council wants to install and operate a network of battery-powered parcel lockers across the borough. The provider must supply, install, and manage the lockers and guarantee the Council a fixed level of income.
-
ClosedSmall-firm friendly
A66 Northern Trans-Pennine Project (NTP) - Schemes 1, 2 and 6 Drainage Materials Provider
Kier Infrastructure needs a drainage materials supplier for the A66 Northern Trans-Pennine upgrade, a major scheme to convert 80km of single-lane A66 between the M6 and A1 into dual carriageway. Supply is for schemes 1, 2 and 6 of the project.
-
ClosedSmall-firm friendly
M6 Lune Gorge - Roundthwaite Box - Piling Package
Kier Infrastructure needs contractors for driven sheet and tube piling work, piling excavation, and pile cutting/burning on the M6 Lune Gorge Scheme at Roundthwaite Box in the central reservation. The work is part of a larger scheme with multiple linked packages.
-
ClosedSmall-firm friendly
Queens Park Lodge House, Queens Park, Ormerod Road, Burnley, Lancashire, BB11 3QW
Refurbishment of Queens Park Lodge House including external elevations, roof repair, full M&E replacement, internal finishes, and window and door replacement. Work to start August 2026.
-
ClosedSmall-firm friendly
Manchester International Airport - Steel Parapet Bridge Fascia
Kier Transportation is procuring a steel parapet bridge fascia as part of platform remodelling at Manchester Airport station. The work supports longer train services by enabling extended platforms.
-
ClosedSmall-firm friendly
Manchester International Airport - Precast Concrete Beams
Kier Transportation is procuring precast concrete beams for platform extension work at Manchester Airport station. The beams will support longer train services by enabling the station to accommodate 144m trains.
-
ClosedSmall-firm friendly
Home Ownership Communal Flooring Replacement Programme 26-30
Survey, measure, supply and install replacement flooring in communal areas across Onward Group's housing portfolio. Work includes subfloor prep, removal of existing finishes, trims, adhesives and waste disposal.
-
ClosedSmall-firm friendly
Refurbish the outside of the studio building at the Holmes Chapel Community Centre
Holmes Chapel Parish Council needs to refurbish the deteriorating external cladding on the studio building at their community centre. The work should focus on the most affected sides, with attention to visual impact on the neighbouring residential area.
-
ClosedSmall-firm friendly
M6 Lune Gorge - Bored Piling Works
Kier Infrastructure needs contractors to supply and install 48 permanent and 2 temporary bored piles (1050mm diameter, 12.1m long) for portal structures on the M6 Lune Gorge scheme. Work is on the B6257 beneath the M6 carriageway with constraints including limited headroom (6-10m), sloping working platform, proximity to Network Rail, and a live B-road.