Contracts
Construction & building works in South East
Public sector contract notices in construction & building works covering South East, from Find a Tender and Contracts Finder.
Construction & building works notices in South East
-
Small-firm friendlyFramework
IT Infrastructure Framework
Dover Harbour Board is establishing a four-lot framework for IT infrastructure covering access control, CCTV, data cabling, and radio systems. Suppliers will be selected to provide services across these categories.
-
Highways Infrastructure Contract
Medway Council is planning to replace its current highways maintenance contract, which covers 845km of roads, 1,100km of footways, 27,000 streetlights, 406 bridges, the Medway Tunnel, and 91,000 other highway assets. The procurement will start in summer 2026 for a contract to begin August 2027.
-
Framework
Link14 Construction & Building Services Framework
Concertus Suffolk is establishing the Link14 Construction & Building Services Framework, a £1bn umbrella agreement for construction and building services work. The framework covers construction work, site preparation, installation, repair and maintenance, and engineering services across seven geographic lots.
-
Extra Care Housing Development - Edinburgh House
Portsmouth City Council is seeking a design, build, finance and operate partner to develop approximately 60 extra care housing units on a site in Cosham. The Council will retain the freehold and offer a long lease with 100% nomination rights on affordable rent basis.
-
Fit-out of Folca 2, Folkestone
F&HDC wants a contractor to fit out a medical centre and commercial space in Folca 2, Folkestone town centre. The work runs from April 2027 to September 2028, with possible extension to February 2029.
-
Small-firm friendly
Depot Fire Break & Void Detection Surveys
TSGN needs surveys of ceiling voids across several depots to identify fire break and void protection non-compliances. The work will assess existing fire stopping and prevention measures, then produce a scope of works for remedial fire protection.
-
ClosedFramework
Planned Upgrade/Improvement Works Dynamic Purchasing System
Notting Hill Genesis is establishing a Dynamic Purchasing System for planned upgrade and improvement works on their housing stock. The DPS will be available to NHG and other entities within their group, with an estimated value of £360m.
-
ClosedSmall-firm friendly
Demolition Services M3J9
Balfour Beatty is seeking demolition services as part of a major upgrade to Junction 9 of the M3 near Winchester. The work includes clearing existing structures to make way for new gyratory bridges, underpasses, and widening of the motorway from 3 to 4 lanes.
-
ClosedSmall-firm friendly
Muck Away Haulage
Balfour Beatty Civil Engineering needs removal of construction arisings - concrete, asphalt and inert materials - from the M3 Junction 9 improvement works near Winchester. The project involves widening the junction, building new gyratory bridges, underpasses, and various other structures.
-
ClosedSmall-firm friendly
HRB Structural Steelwork
Design and installation of structural steelwork for the Hampstead Road Bridge, a 140m five-span steel structure over HS2 railway lines. Work includes temporary works design, stability assessments during erection, and removal, delivered in two separate installation visits.
-
ClosedSmall-firm friendly
Replacement Slide and Apparatus Rusper Playground
Rusper Parish Council wants to install a multiplay slide unit with platform and impact-absorbing rubber surfacing at their playground on Rusper High Street. The equipment is for children aged 4–12 and must meet EN 1176 safety standards.
-
ClosedSmall-firm friendly
Downs to the Sea - Potential to Reality Project Work - Track Upgrade
The RSPB needs an access track upgraded at Amberley wetland site to enable better management and site restoration. The site has complex peat and water control challenges, and infrastructure has deteriorated over years.
-
Closed
LDC - Robinson Road Waste Depot Redevelopment
Lewes District Council wants a design-and-build contractor to construct a new welfare building, extend and refurbish an existing workshop, and lay hard landscaping with EV charging at their Robinson Road waste and recycling depot.
-
ClosedSmall-firm friendly
Henry Player Ave, Thomas Grant Ave & Fielder Court Replacement Windows & Doors
Supply and install replacement windows and doors at three residential properties in the Gosport and Waterlooville area. The work covers Henry Player Ave, Thomas Grant Ave, and Fielder Court.
-
ClosedSmall-firm friendly
VIVID - Electrical Systems for Kitchens and Bathrooms
VIVID Housing is seeking supply and installation of electrical systems in kitchens and bathrooms across their housing portfolio. The contract is valued at £1.25m.
-
ClosedSmall-firm friendly
CA16462 - R5989 Major Overhaul of Vent Plant
Epsom & St Helier University Hospitals NHS Trust needs major overhaul work on ventilation plant, including AHU repairs and in-service improvements. The work is procured through MultiQuote's platform.
-
ClosedSmall-firm friendly
VIVID - Supply and Installation of Vinyl Flooring for Kitchens and Bathrooms
VIVID Housing needs supply and installation of vinyl flooring for kitchens and bathrooms across its housing stock. The contract is worth £1m over its full term.
-
ClosedFramework
INSPECTION, TESTING & REPAIR WORKS TO CONCRETE & MASONRY STRUCTURES (MTC)
Southampton City Council is establishing a measured term contractor framework for inspection, testing, and repair of concrete and masonry structures across its estate. This covers residential tower blocks, council buildings, schools, and commercial/industrial properties.
-
ClosedSmall-firm friendly
GB-Headington: MW2507 - Hastoe - Balcony Remediation Works
Hastoe Housing Association is seeking contractors to replace metal balustrades, repair concrete, and apply waterproofing on balconies at a property in Headington. The works are valued at £500,000.
-
ClosedSmall-firm friendly
Church Lane Car Park Drainage
Install three large drainage soakaways in grass verges at Church Lane Car Park, including excavation, infiltration crate installation, and reinstatement of kerbs and surfaces.
-
ClosedSmall-firm friendly
Witney Council New Works Depot Construction and Clubhouse Refurbishment
Witney Town Council wants a contractor to build a new works depot with covered parking and storage at West Witney Sports Field, and refurbish an adjacent sports and social club. Both projects include groundworks, M&E, interior fit-out, and solar panels.
-
ClosedSmall-firm friendly
Ryebank - Klargester Replacement
West Sussex County Council needs to replace a Klargester sewage treatment system at Ryebank Gypsy Traveller Site. This is a straightforward replacement under JCT terms.
-
ClosedSmall-firm friendly
Ryebank - Klargester Replacement
West Sussex County Council needs to replace a Klargester sewage treatment system at Ryebank Gypsy Traveller Site. The work is specified under JCT terms.
-
Closed
VIVID Fire Stopping and Compartmentation Works
VIVID Housing is seeking a supplier for fire stopping and compartmentation works across their operating area. The contract covers installation of fire prevention measures.
-
ClosedSmall-firm friendly
Fire Safety Works - Post Office Area - Milton Keynes Civic Offices
Milton Keynes City Council needs fire safety improvement works to internal partitions, ceilings and fire doors in the Post Office area of the Civic Office building. The space has been vacant since a previous tenant (National Westminster Bank) left in 2023.