Bidwire
UK public sector contracts
ClosedSmall-firm friendly

HRB Structural Steelwork

Design and installation of structural steelwork for the Hampstead Road Bridge, a 140m five-span steel structure over HS2 railway lines. Work includes temporary works design, stability assessments during erection, and removal, delivered in two separate installation visits.

You'll want to look if you specialise in structural steelwork erection and have experience designing and managing temporary works for complex bridge installations

  • Temporary works designs must be approved by the Contractor
  • Assessments of temporary stability during erection process required