Contracts
Construction & building works
Public sector contract notices in construction & building works, from Find a Tender and Contracts Finder.
Narrow by region
Construction & building works notices
-
ClosedFramework
Complex Repairs and Major Voids
Platform Housing wants contractors to handle day-to-day responsive repairs, complex disrepair jobs over £1,500, and major void works over £20,000 across its housing stock. Work covers a range of property types and will be delivered through a multi-contractor model across three regions.
-
Closed
Electrical Testing and Repairs
Platform Housing is appointing contractors to carry out electrical installation condition reports, remedial work, and repairs across its housing portfolio to meet statutory compliance. Services will be delivered on a regionalised basis with one contractor per lot.
-
Closed
Portsmouth City Council - Term Service Contracts for the Repairs & Maintenance of Residential and Commercial Properties for Council Managed Assets - 2026
Portsmouth City Council is appointing two suppliers to deliver repairs and maintenance across its housing stock of approximately 17,500 homes, split between on-island and off-island properties, plus corporate assets. Contracts run five years with optional five-year extension.
-
ClosedSmall-firm friendly
Fleet Infrastructure Depot Doors -Planned Preventative and Reactive Maintenance , Replacement and Overhaul Project
Govia Thameslink Railway is seeking a supplier to provide depot shed roller shutter doors, maintenance, replacement of worn units, overhaul where needed, and a planned preventative maintenance programme for existing doors.
-
ClosedSmall-firm friendly
Fleet Infrastructure Depot Doors -Planned Preventative and Reactive Maintenance , Replacement and Overhaul Project
Govia Thameslink Railway needs supply and maintenance of roller shutter doors for their depot sheds, including replacement of worn doors, overhauls where needed, and a planned preventative maintenance programme.
-
ClosedSmall-firm friendly
Fleet Infrastructure Depot Doors -Planned Preventative and Reactive Maintenance , Replacement and Overhaul Project
Govia Thameslink Railway wants proposals for supply and maintenance of depot shed roller shutter doors, including replacement of worn doors, overhaul where needed, and a planned preventative maintenance regime for existing doors.
-
ClosedFramework
66/132kV Cable Installation Framework
National Grid is establishing a framework for installation of 66kV, 132kV and lower voltage cable circuits, including jointing, testing and commissioning across their network. Work covers full installation of cables, earth wires and telecom ducts to specification.
-
Closed
London Gateway - BOXBAY Main Works
Construction of a 323m × 159m × 55m high automated container storage facility at London Gateway Port, including demolition of existing services, installation of over 5,000 precast piles, reinforced concrete raft foundation, below-ground infrastructure, and associated civil and minor building works within an operational terminal.
-
ClosedFramework
Framework for the provision of a Tunnelling, Drilling & Shaft Works for Build Only and Design & Build
Severn Trent Water is establishing a multi-lot framework for tunnelling, drilling and shaft construction work. Suppliers can bid for build-only or design-and-build delivery across 17 specialist lot types including pipe ramming, horizontal directional drilling, micro tunnelling, pipe jacking and segmental tunnelling.
-
ClosedFramework
Civil Works within NGED Substations 132kV, 66kV, 33kV and 11kV Framework
National Grid is establishing a £40m framework for civil engineering and building work on electricity substations across their distribution network. Work includes new substation construction, building refurbishment, foundations, drainage, fencing, and maintenance tasks like roof repairs and structural modifications, often in live electrical environments.
-
ClosedFramework
Fire Alarm Installation and Associated Works
Thames Water is establishing a framework agreement with up to four suppliers to design, supply, install and maintain fire alarm systems across their region, primarily on operational sites. The strategy includes standardising the existing mixed estate (Advance, Protec, Gent, Kentec panels) to Advance panels.
-
Closed
Construction of 4 storey extension at NSCG Newcastle
Newcastle and Stafford Colleges Group is seeking a contractor to design and build a 4-storey extension at their Newcastle campus. The work will be procured through a single-stage design and build route.
-
Closed
Construction of a new laboratory building (Holt 2 Lab), designed and built to operate at Containment Level 3 (CL3) standards
Construction of a new Containment Level 3 laboratory building at Forest Research's Alice Holt Research Station in Surrey. Turnkey fixed-price contract on NEC4 terms with detailed design already completed; contractor takes responsibility from RIBA Stage 5 onwards.
-
ClosedFramework
Scotland's Railway Electrification Framework
Network Rail is establishing a framework to appoint one contractor for overhead line electrification, traction power, power distribution, and associated design works across Scotland. The framework will cover approximately £300m of identified works plus £150m for emerging projects over its term.
-
Closed
The Supply and Installation of Domestic Kitchens
Swindon Borough Council needs removal of existing kitchens and supply and installation of new ones across its housing stock, with all associated plumbing, electrical, decorative and flooring work. Work is on a cyclical basis over three years with an option to extend for two more.
-
ClosedSmall-firm friendly
Roehampton Gate Café - Main Construction Works
The Royal Parks is replacing aging facilities at Roehampton Gate Car Park in Richmond Park: a café building, catering kiosk, cycle hire facility, storage shed, and public toilets. This is the main construction works following an enabling works phase.
-
ClosedSmall-firm friendly
GWR - Paddington Catering Facility Refurbishment Tender
First Greater Western is refurbishing the catering facility at Paddington station. The work includes replacing refrigeration and air conditioning units, upgrading the ventilation system, rewiring electrical services, full welfare area renovation, and redecoration.
-
Closed
West Midlands Pension Fund - Midpoint Birmingham - Principal Contractor PSQ
West Midlands Pension Fund is seeking a principal contractor to design and build a new warehouse and industrial unit at Longwell Green Retail Park, Birmingham. This is a two-stage competitive process; four suppliers will be selected from stage 1 (PSQ) to tender in stage 2.
-
ClosedFramework
Place for London - Minor Works Framework Agreement
Places for London is establishing a framework agreement for minor works contracts to maintain and improve their property estate. They want delivery partners who can work collaboratively, meet safety and quality standards, and support their net zero and ESG goals.
-
ClosedSmall-firm friendly
Ledsham School
Cheshire West and Chester Council is procuring construction of a new primary school building at Ledsham, Little Sutton. This is a new-build project rather than an extension or retrofit.
-
Closed
Housing Repairs 2027
Hammersmith and Fulham Council is seeking suppliers for responsive repairs, void works, disrepair treatment, and damp & mould services across its council housing stock. The contract runs for six years with mobilisation by August 2027.
-
Closed
Octagon Theatre Refurbishment Project
Somerset Council is refurbishing and extending the Octagon Theatre in Yeovil, including a new foyer extension, studio and café extensions, stage house vertical extension, and external access works. The contract uses NEC4 ECC Option A terms.
-
ClosedSmall-firm friendly
ANDBC Appointment of an Integrated Consultancy Team for the Redevelopment of Bangor Marina and Harbour Wetside Facilities under Bangor Waterfront Redevelopment
Ards and North Down Borough Council is appointing an integrated consultancy team to design and deliver the redevelopment of Bangor Marina and Harbour Wetside Facilities as part of a wider waterfront regeneration. The project sits within the Belfast Region City Deal framework and covers a 2-mile stretch of waterfront in Bangor, County Down.
-
ClosedFramework
183592 CP7 Earthworks Asset Monitoring Capital Delivery Western Framework
Network Rail needs surveys, installation of earthwork failure detection systems, cant and twist sensors, and ground investigation assessments on the Western and Wales route. The contract includes ongoing maintenance of these monitoring assets.
-
ClosedFramework
Mobile Plant and Tools: Hire, Purchase and Maintenance
Severn Trent Water is establishing frameworks for hire of mobile plant, site services and power tools, plus purchase of the same, and single-source contracts for service and reactive repair of their own equipment.