Contracts
Construction & building works
Public sector contract notices in construction & building works, from Find a Tender and Contracts Finder.
Narrow by region
Construction & building works notices
-
ClosedSmall-firm friendly
SDDCP006 Arthur Street Play Area
South Derbyshire District Council wants a supplier to design, supply, install and commission a new inclusive children's play area at Arthur Street in Swadlincote. The work is a single site project with a budget of £100,000.
-
Closed
MAC Door Access System
Duston Parish Council wants to replace manual locks with a card-based access control system at two community centres. The work includes supply, installation, commissioning and handover of the MAC Card system.
-
ClosedSmall-firm friendly
Lift Replacement - Gerddi'r Ffynnon, Aberystwyth
Wales and West Housing Association needs a full replacement of a single passenger lift at a residential building in Aberystwyth. The work includes removal of the old lift, design, supply, installation, testing, commissioning and handover of the new one.
-
ClosedSmall-firm friendly
Internal Alterations to Manor Office, 6 North Street, Crediton, EX17 2BT
Crediton Town Council wants internal alterations and refurbishment to Manor Office, a historic listed building in Crediton. Work is on ground and first floors only, subject to Listed Building Consent and conservation-led construction techniques.
-
ClosedSmall-firm friendly
Manchester International Airport - OLE Phase 3 Works
Kier Transportation is procuring works to remodel Manchester Airport railway station, including platform addition or extension to accommodate longer train services. The scheme involves modifications to enable two 144m trains to operate using two of the four platforms.
-
ClosedSmall-firm friendly
Principle Contractor for a new cemetery in Gillingham
Gillingham Town Council is seeking a principal contractor to build a new cemetery on agricultural land off Common Mead Lane. The design emphasises environmental integration, biodiversity net gain, sustainable drainage, and accessible facilities.
-
ClosedSmall-firm friendly
Large Infill Modernisation Phase 2
The Science Museum needs a lift modernisation at their main London site, including design, supply, installation, testing and commissioning. The work includes dismantling and removing the existing lift.
-
Closed
Units 1-5, Centennial Park, Airspeed Road, Portsmouth
Design and build 5 single-storey warehouse units at Centennial Park, Portsmouth, with mezzanine offices and full external works including parking, landscaping, and EV charging infrastructure.
-
ClosedSmall-firm friendly
Mental Health Emergency Department (MH ED)
Avon and Wiltshire Mental Health Partnership NHS Trust is tendering for construction works to remodel their existing estate and create a new Mental Health Emergency Department. The contract covers building works including overhaul and refurbishment.
-
ClosedSmall-firm friendly
Trinity Arts & Leisure Centre; Heating & Hot Water Upgrade Project
Bedford College needs a mechanical and electrical contractor to remove the existing heating and hot water plant and install a new system at Trinity Arts & Leisure Centre. The work includes design, supply, installation and commissioning.
-
ClosedFramework
HSHA – Responsive Maintenance, Void Property Works, Roofing and Drainage
Hanover Housing Association is seeking contractors for responsive maintenance, void property works, roofing and drainage across its Scottish housing stock. The work covers occupied homes, empty properties, communal areas, and supported housing.
-
ClosedSmall-firm friendly
Festive Lighting for Stirling City Centre
Stirling Council wants a contractor to handle festive lighting in the city centre, including storage, inspection, testing, maintenance, installation, commissioning, removal and repair. The contract runs for an unspecified term.
-
ClosedSmall-firm friendly
Dartford Football Club Roof Cladding Works
Dartford Borough Council is tendering for replacement of external wall cladding and roof waterproofing on the Dartford Football Club clubhouse. Full project details are available on the Kent Business Portal.
-
ClosedSmall-firm friendly
POW-ITT-63983 STAFF CHANGING ROOMS AT LLANDILOES HOSPITAL
Refurbishment of staff changing rooms and sanitary facilities at Llanidloes War Memorial Hospital. Work includes flooring, doors, electrical, lighting, sanitary fittings, ventilation and plumbing.
-
ClosedSmall-firm friendly
Huyton MSCP Lift Control Upgrade
Replace the control system and hardware for 2 passenger lifts in Huyton Multi-Storey Car Park. The lifts are currently out of use pending this upgrade, and the contract includes 12 months of servicing and warranty.
-
ClosedSmall-firm friendly
Contract for Roofing and Solar Panels at Heol Emrys and Tudno, Lavender Court
Swansea Council wants roofing and solar panel work at two residential addresses: Heol Emrys and Tudno, Lavender Court. The work covers proposed improvements to plots 1-16.
-
ClosedSmall-firm friendly
New Mental Health Emergency Department Unit at Luton Centre for Mental Health
East London NHS Foundation Trust is seeking a contractor to build a new mental health emergency department unit at Luton Centre for Mental Health. The work is new construction as per the tendering specification.
-
ClosedSmall-firm friendly
Maintenance of Life Critical Fire Alarm Systems and AFD Equipment
Cwm Taf Morgannwg University Health Board needs comprehensive maintenance and testing of fire alarm systems across its estate of acute hospitals, community hospitals, health centres, clinics and administrative buildings. The contract includes planned preventative maintenance, 100% testing of automatic fire detection equipment, reactive maintenance, emergency call-outs, monitoring equipment maintenance and certification.
-
ClosedFramework
Decorating Supplies and Works
A three-lot framework for paint products, tenant paint pack schemes, and decorating services for public sector organisations. The framework will run for multiple years and cover residential, commercial, educational and healthcare properties.
-
ClosedSmall-firm friendly
Fire Alarm System Installation at BATUK
Fire alarm system installation at Kifaru Barracks. Buyer is the Defence Infrastructure Organisation.
-
ClosedSmall-firm friendly
NRW/21219 St Andrews MSCP - Structural Repairs
Norwich City Council needs structural repairs to St Andrews multi-storey car park, including water ingress remediation, gutter replacement, drainage renewal, and protective coating to corroded steelwork. Work must proceed level-by-level while keeping the car park operational.
-
ClosedFramework
RESPONSE MAINTENANCE AND IMPROVEMENT WORKS
Northern Ireland Housing Executive is seeking supplier(s) for a large responsive maintenance and repair service covering their housing stock. The work includes emergency repairs, void property works, asbestos services, fire safety works, and compliance inspections across Northern Ireland, operating 24/7/365.
-
ClosedSmall-firm friendly
Moorfield Road Open Space Improvement Project
Carn Brea Parish Council is improving Moorfield Road Open Space with new paths, entrances, landscaping, play equipment and temporary car parking. Work is split into two phases: Phase 1 covers asphalt paths, entrances and car park; Phase 2 covers broader landscaping, planting and play equipment installation.
-
ClosedSmall-firm friendly
Blenheim Drive Play Area Upgrade - Filton Town Council Conygre Regeneration Project
Filton Town Council wants to redesign, supply and install play equipment and safety surfacing to redevelop an existing play area on Blenheim Drive. The scheme has an aviation theme reflecting the town's aerospace heritage.
-
ClosedSmall-firm friendly
Supply and Installation of two (2) Fire Behaviour Training Containers for Suffolk Fire and Rescue Service
Suffolk Fire and Rescue Service needs two fire behaviour training containers supplied and installed. The budget is £120,000 excluding VAT.