Construction & building works
Public sector contract notices in construction & building works, from Find a Tender and Contracts Finder.
Narrow by region
Construction & building works notices
-
ClosedSmall-firm friendly
SU112(26) Sketty Lane Track Resurfacing & Lighting Works
Full overlay resurfacing of the athletics running track at Sketty Lane with preparation and new track system installation, plus drainage improvements. Upgrade of lighting infrastructure to LED floodlighting with removal of old fittings.
-
ClosedSmall-firm friendly
ITT - CSM Demonstration Survey UID 218
Historic England is commissioning a marine archaeological geophysicist or surveyor to work aboard RV Cefas Endeavour during the UK CSM Demonstration Survey in April–May 2026. The role involves operating geophysical survey equipment on a 12-hour shift pattern during a seabed mapping survey.
-
ClosedSmall-firm friendly
Installation of CVIM Generator Back Up Power
Design and build of a permanent automatic backup power system for vaccine production facility, comprising a 510kVA emergency generator and UPS to protect against site-wide power failures. Work is at the CVIM building in Pirbright, Surrey.
-
ClosedSmall-firm friendly
Provision of Cycle Hangar Rental and Maintenance Service
Manage rental operations and maintenance for Kensington & Chelsea's cycle hangars, currently 96 units growing to 221 by March 2028. Handle tenant sign-ups, payments, repairs, and upkeep of all borough-owned hangars.
-
ClosedFramework
Open framework to supply and install Solar PV
West Mercia Energy is establishing an open framework for suppliers to deliver solar PV systems and installation across public sector buildings, primarily schools. Multiple suppliers will be appointed to this £80m framework for energy efficiency works.
-
ClosedSmall-firm friendlyFramework
DFG Adaptation Works
Breckland Council is establishing a framework of contractors to deliver home adaptations funded by Disabled Facilities Grants. Work includes bathroom reconfigurations, level access showers, door widening, ramps, and access improvements across the district.
-
ClosedSmall-firm friendlyFramework
ateb Retrofit Framework
ateb Housing Group is establishing a 7-lot framework for retrofit, planned maintenance and decarbonisation work on their housing stock to reach net zero targets. They will appoint multiple contractors per lot to deliver electrical, mechanical, fabric and whole-house retrofit work, plus M&E consultancy.
-
ClosedSmall-firm friendly
RETFORD TOWN SQUARE SECURITY ENHANCEMENTS
Bassetlaw District Council is enhancing physical security at Retford Town Square under Martyn's Law. The work includes archaeological investigation, removal and relocation of existing street furniture, and installation of anti-vehicle bollards and resistant benches.
-
ClosedSmall-firm friendlyFramework
PS-25-229 - Fire Suppression (Sprinkler) System Service, Maintenance & Repair MTC
East Ayrshire Council wants planned servicing, testing and certification of non-domestic sprinkler systems, fire hydrants, dry risers, gas suppression and cookerhood systems, plus emergency repairs. Work is mostly during normal hours.
-
ClosedSmall-firm friendly
Electrical Rewiring
Trent & Dove Housing wants a contractor to deliver electrical rewiring across its housing stock, including full and partial rewires, consumer unit replacements, and certification. Work is in occupied and void residential properties, released in batches with no guaranteed volume.
-
ClosedSmall-firm friendly
Homelessness and Rough Sleeping Services procurement
East Suffolk Council is commissioning homelessness and rough sleeping services for 2026–2029. Two lots: a 12-bed Safe to Stay Hub in Lowestoft with staffing included, and 10 Rough Sleeping Initiative beds dispersed across East Suffolk (staffing by council's outreach team).
-
ClosedSmall-firm friendly
Supply and Installation of Secondary Glazing at Commonwealth War Graves Commission Headquarters
Installation of secondary glazing at the CWGC headquarters building in Maidenhead. The notice does not state the contract value.
-
ClosedSmall-firm friendly
Todmorden Market Culvert Strengthening Works
Design, supply and installation of carbon fibre reinforcement plates to cast iron beams in an existing river culvert running beneath Todmorden market hall and outdoor marketplace. Mandatory site visit required to bid.
-
ClosedSmall-firm friendly
Invitation to Tender for the provision of Trinity Primary School - Roofing Replacement Works
Herefordshire Council needs a contractor to replace the failed roofing system across three areas of Trinity Primary School, including new rooflights and ceiling replacement.
-
ClosedSmall-firm friendly
The Crossings, Hull – CSIP Refurbishment Works
The Riverside Group wants a contractor to remodel the reception area and carry out external improvements at The Crossings in Hull.
-
ClosedSmall-firm friendly
The Esplanade - Remedial Works
Remedial works to The Esplanade including external works, roofing, rainwater goods, communal areas, windows and doors. The scope covers a mix of structural and finishing trades across multiple building elements.
-
ClosedSmall-firm friendly
5433 - St. Martins Comprehensive School - Curtain Walling & Associated Works
Replace curtain wall, doors, and high-level windows at St Martins Comprehensive School, along with cladding renewal, ceiling replacement, and associated M&E and making-good works. The work must complete within the six-week summer holidays (20 July to before students return).
-
ClosedSmall-firm friendly
Youth in Romsey – Over-Roof
Test Valley Borough Council needs a timber flat roof installed over an existing steel roof at a youth centre in Romsey, plus skylight replacement and PV array removal/reinstatement. Work must complete in 6 weeks.
-
ClosedSmall-firm friendly
Electrical Testing Commercial Properties
Cambridge City Council needs electrical testing and remedial work across their operational properties including offices, commercial units, community centres, public toilets and car parks. The work is prioritised to assess electrical installation condition ahead of potential EV and PV upgrades.
-
ClosedSmall-firm friendly
Invitation to Tender For Relining of Pond at Kent & Sussex Crematorium
Tunbridge Wells Borough Council wants to reline a large pond in the grounds of Kent and Sussex Crematorium and put it back into use. The work is at a single site in Tunbridge Wells.
-
ClosedSmall-firm friendly
A66 - FRC
Balfour Beatty is seeking reinforced concrete work on the A66 scheme, covering abutments, wing walls, central pier, precast deck panels, and parapets. The package includes temporary works design, falsework, concrete testing, and all labour and materials to complete the structure.
-
ClosedSmall-firm friendly
STANTA-Bodney Camp-Electrical Intake Upgrades to support DNO upgrades
Design and upgrade electrical infrastructure at Bodney Camp to accommodate increased power supply from UK Power Networks. The work supports a DNO (Distribution Network Operator) capacity uplift.
-
Closed
Cornwall Surface Dressing – Large Tanker and Small Tanker Works 2026
Corserv Solutions (Cormac Division) wants a contractor to surface dress approximately 96,800m² with large tanker works and 24,307m² with small tanker works across various sites in Cornwall. The contract includes supply of materials and all traffic management.
-
ClosedSmall-firm friendly
STANTA-Bodney Camp-Electrical Intake Upgrades to support DNO upgrades
Ministry of Defence requires design and construction of a new electrical intake switchroom and associated works at Bodney Camp to support a utility company upgrade. The scope includes a substation plinth, HV and LV cabling, earthing, switchboard installation, and associated builderswork.
-
ClosedSmall-firm friendly
Landlord Strip Out Works, 101/103 St. James Street, Burnley
Remove existing tenant shop fit, test and commission services, and make good a stepped concrete plinth to create a level floor at a shopping centre unit in Burnley. Works follow existing specification documents and take 6–8 weeks from March 2026.