Construction & building works
Public sector contract notices in construction & building works, from Find a Tender and Contracts Finder.
Narrow by region
Construction & building works notices
-
ClosedSmall-firm friendly
QRSV Blocks 5,6 & 7 Refurbishment
Redecoration and flooring works to three residential blocks at Queens Road Student Village. The works cover blocks 5, 6 and 7 in the university's student accommodation.
-
ClosedSmall-firm friendly
Supply and Installation of addition solar PV panel generation system
University of Salford wants to add a second 15 kWp solar panel array to the roof of its NERIC building (doubling the existing 15 kWp system installed in 2022). You'll need to supply panels, inverter and installation, plus produce a 20-year financial and carbon model based on their projected building consumption.
-
ClosedSmall-firm friendly
Multi-Lot - Plantroom Works at 4 Hillingdon Schools
Boiler replacement and plantroom works across 4 primary schools in Hillingdon. The work includes replacing boilers, pipes, pumps, sensors and associated plant room equipment.
-
ClosedSmall-firm friendly
Penistone Town Hall Phase 2 Cinema and Associated Works
Refurbish Penistone Town Hall with a new cinema room, upgraded heating system, window repairs and replacements, and internal alterations. Single phase project valued at £1.5m.
-
ClosedSmall-firm friendly
Ashfield District Council - Towns Fund - Walking & Cycling
Ashfield District Council wants to improve three cycling and walking routes through surface removal, earthworks, drainage, resurfacing, signage and vegetation work on existing public rights of way. The project is part of the Towns Fund programme.
-
ClosedSmall-firm friendlyFramework
PS/25/67 - Traffic Surveys Framework
East Ayrshire Council is establishing a framework for traffic surveys and monitoring across East and South Ayrshire. They will call off as needed for various survey and installation work at different locations.
-
Closed
Lighting Network Renewal Works
Glasgow City Council is renewing its street lighting network across the city. Work includes replacing columns and luminaires, plus associated underground and overhead infrastructure.
-
ClosedSmall-firm friendly
Hostile Vehicle Mitigation
Birmingham City Council wants to standardise and improve hostile vehicle mitigation (HVM) measures across the city, replacing mismatched systems with a single integrated solution that works reliably and can be properly maintained.
-
ClosedSmall-firm friendly
UWQ340 St Johns Campus Resurfacing and Repairs
The University of Worcester needs resurfacing and repair work done to the main road running through its St John's Campus. The scope includes all associated works for this road surface project.
-
ClosedSmall-firm friendly
268400 - Campus Lounge Fit Out
De Montfort University wants to convert an 850 sqm canteen into a modern campus lounge with new seating, minor flooring work, and light M&E adjustments. The supplier must deliver design, 3D visuals, floor plans, and all furniture and building works on a turnkey basis.
-
ClosedSmall-firm friendly
Finsley Gate 2 & 4 Car Parks, Burnley - Surfacing Improvements
Burnley Borough Council wants to resurface and reconfigure two car parks at Finsley Gate. The work covers resurfacing and layout changes to both sites.
-
ClosedSmall-firm friendly
RFQ 2025/67 - Removal of the Sandbar at the Entrance to Newcastle Harbour Annually for a Two Year Period, 2026 – 2027
Remove accumulated sandbar from Newcastle Harbour entrance annually and relocate the sediment to a nearby beach section for dispersal. Two-year contract covering 2026 and 2027.
-
ClosedSmall-firm friendly
Greengates Rec Play Area Refurbishment
Supply and install play equipment, street furniture, and safety surfacing at Greengates recreation ground, following provided design and specification documents.
-
ClosedSmall-firm friendly
5460HP - Hengoed Primary School - SRB Provision
Caerphilly County Borough Council is tendering for SRB (Special Resource Base) provision at Hengoed Primary School. The work involves building construction and installation as shown in the drawings and schedules provided.
-
ClosedSmall-firm friendly
Replacement Fan Coil Unit
Supply and installation of a replacement fan coil unit at Hexham General Hospital. Single unit replacement as part of building services maintenance.
-
ClosedSmall-firm friendly
4993.EFM.SW Hendersons Fit-Out Works
University of Sheffield is converting a two-storey building (the old Hendersons relish factory on Leavygreave Road) into office and collaboration space for staff and students. The scope includes full fit-out works to adapt the building for university use.
-
ClosedSmall-firm friendly
Lon Eifion Active Travel - Emergency Works Embankment Failure
Emergency repair of an embankment failure on an active travel route, including culvert replacement, embankment reinstatement, surfacing, fencing, and site restoration.
-
ClosedSmall-firm friendly
Blyth Remedial Works
Remedial works at Blyth comprising dry dock repairs and river frontage works. ORE Catapult intends to appoint one contractor for both packages, though they may split them if beneficial.
-
ClosedSmall-firm friendly
Central Substation RIBA4 & Build
KBS Maritime requires design development (RIBA Stage 4 technical design) and construction of a new Central Substation building. The work is split into design and build phases, excluding electrical switchgear installation.
-
ClosedSmall-firm friendly
e-ITT for the provision of Lymington Health and Leisure Roof Refurbishment
New Forest District Council is seeking contractors to refurbish the degrading roof at Lymington Health and Leisure Centre, which is allowing water ingress. Work includes roof covering replacement, access provision, and scaffolding safety measures.
-
ClosedSmall-firm friendlyFramework
HV Authorised Persons, Installation, and Maintenance Services
University Hospitals Birmingham NHS Foundation Trust needs 24/7 HV emergency cover plus planned maintenance and inspection of high voltage systems including transformers, switchgear and RMUs across their sites. The contract is available to other NHS Trusts in the Birmingham, Black Country and Solihull ICB Cluster.
-
ClosedSmall-firm friendly
MGN214 Repointing, re-rendering and concrete window surround replacement at Whitfield Rd & Bridport Rd, Dorchester
Repointing, re-rendering and concrete window surround replacement at two residential addresses in Dorchester. Work to improve external building fabric condition.
-
ClosedSmall-firm friendly
Vandyke Road Cemetery - Lychgate Repairs
Repairs to a 19th century lychgate at a cemetery in Leighton Buzzard. Work includes masonry repairs, new roof covering with structural strengthening, and a new rainwater system.
-
ClosedSmall-firm friendly
BBV HS2 MWCC North - Project Wide Noise Barrier Acoustic Doors (Supply Only)
HS2 main works contractor needs supply and installation of SR2 and SR3 acoustic door sets (single and double leaf) using Rhino-HF+ Premium or equivalent systems for noise barriers on the Area North project. This is an expression of interest stage leading to a competitive mini-tender after technical screening.
-
ClosedSmall-firm friendly
Grassington Playground pump track and wheel play area
Grassington Parish Council wants a contractor to design and build a pump track on a hardstanding area within their main playground, replacing an aging skate park. The site is approximately 21.5m x 18m with existing ramps to be removed before work starts.