Surveying, architecture & engineering in North West
Public sector contract notices in surveying, architecture & engineering covering North West, from Find a Tender.
SortClosing soonestLargest valueA to Z
Surveying, architecture & engineering notices in North West
-
ClosedFramework
Environmental Safety Case: General Tech inc Geological & Hydrogeological
NWS is establishing an open framework for specialist technical support to its Environmental Safety Case team. The work involves qualified staff to deliver scoped packages supporting the Low Level Waste Repository's regulatory obligations and forward programme.
-
ClosedSmall-firm friendlyFramework
Sitewide Planning Consultancy Framework for Science and Industry Museum, Manchester
Strategic planning advice to support delivery of the Science and Industry Museum Manchester Masterplan. The consultant will coordinate with Manchester City Council planning department and design teams, and handle planning queries that arise during the contract term.
-
ClosedSmall-firm friendly
Bridge Scour Level 2 Inspections 2026 (56 Structures)
Tameside Council needs Level 2 scour inspections on 56 bridge structures. The work is scheduled for 2026.
-
Small-firm friendly
Legionella Water Temperature Monitoring
Lancashire County Council is splitting legionella water temperature monitoring and inspection services into two geographical contracts (north and south) across its county premises. Work includes regular monitoring, inspections to meet HSE ACOP L8, and reactive repairs.
-
Small-firm friendly
Wigan Council - Portable Appliance Testing (PAT)
Wigan Council needs a supplier to carry out Portable Appliance Testing (PAT) across its premises and assets. The contract is valued at £150,000.
-
Small-firm friendly
Cheshire and Warrington Combined Authority - Transport Operating Model, Functions Assessment and Transition Planning
Cheshire and Warrington Combined Authority needs consultants to assess its transport functions and design an operating model. Deliverables must be detailed enough to go straight to implementation, not high-level strategy.
-
Small-firm friendly
Quantity Surveying, Cost Consultancy and Project Management Services for an Integrated Contact Centre
North West Ambulance Service needs a quantity surveyor and cost consultant to help their estates department procure professional design services for an integrated contact centre. The role covers cost consultancy and project management for this development.
-
Small-firm friendlyFramework
Countryside Land Management and Estate Maintenance Framework
Lake District National Park Authority is building a multi-supplier framework agreement for countryside land management and estate maintenance work. Suppliers can bid for one or more lots and do not need to offer all services within a lot, only at least one.
-
Small-firm friendly
Sandscale Integrated Depot - RIBA 3 Design Study
Westmorland and Furness Council needs RIBA Stage 3 design and cost documentation for an integrated depot at Sandscale Park in Barrow-in-Furness, including technical surveys, environmental assessments, and planning support work. The design must account for modular buildings and existing infrastructure at the site.
-
Small-firm friendly
Prioritised Capital Improvements Programme - School Properties 2026-28
Cumberland Council wants to appoint two firms (architects, building surveyors, and M&E engineers) to design a prioritised capital improvements programme for schools. Work will mostly happen during school holidays, running from November 2026 for two years.
-
Small-firm friendly
Re-purposing Penrith Town Hall into a Creative and Community Hub
Westmorland and Furness Council wants to appoint a lead multi-disciplinary consultancy team to design and deliver the conversion of Penrith Town Hall, a Grade II listed building, into a creative and community hub with a museum. The team will take the project through RIBA Stages 0-6, building on an existing outline business case.
-
Provision of a deep geothermal solution
Countess of Chester Hospital seeks a development partner to design and deliver a deep geothermal heating solution for the hospital site. The work is structured around staged gateways with Salix PSDS grant funding drawdown, potentially leading to a long-term Energy Services Agreement.
-
Continuous Water Quality Monitoring (CWQM)
United Utilities is procuring end-to-end delivery, installation, operation and data assurance for continuous water quality monitoring across their wastewater network to comply with Section 82 of the Environment Act. The supplier must provide hardware, integration with existing telemetry and data platforms, and near-real-time data availability.
-
Small-firm friendlyFramework
Dynamic Market for Legionella Services
Lancashire County Council is establishing a dynamic market (framework) for legionella risk assessment, water temperature monitoring, and remedial works across the county. Suppliers can join to deliver these services to council buildings and facilities.
-
Small-firm friendlyFramework
IWM/2627/Exh/3514: 3D Exhibition Design Services Framework for Imperial War Museums
Imperial War Museums is recruiting suppliers for a three-year framework to provide 3D exhibition design services for museum and heritage environments. Call-off contracts will be placed as needed; this is the qualification stage only.
-
Framework
Transportation & Public Realm Consultancy Services Framework
Warrington Borough Council is establishing a framework for consultancy services covering transport planning, highway design, active travel, public realm improvements and related advisory work. The framework will be available to Warrington and other local authorities across Cheshire and surrounding areas.
-
GMCA 1185 Salford Road MRF Equipment
GMCA is procuring design, build, installation, commissioning and testing of new commingled dry recycling sorting equipment for a materials recovery facility at Salford Road, Over Hulton, Bolton. The new plant will process 140,000 tonnes per annum of mixed dry recyclables collected across Greater Manchester.
-
Phase 1 - Silicon Sands Campus
Blackpool Council is seeking a third-party concessionaire to invest in, develop and operate a 6MVA data centre with office space at Blackpool Airport Enterprise Zone, and to connect its waste heat to a local heat network. The contract is a 3-year operational concession with a 250-year land lease.
-
Electric Vehicle Charging Infrastructure
Lancashire County Council is procuring installation of public electric vehicle charging points across the county, funded by the government's Local Electric Vehicle Infrastructure scheme. The work includes both standard chargepoints and lamppost-integrated chargers.
-
Engineering Contractor for ECI and remedial works Ventilation Stations across the Mersey Tunnels Estate
Merseytravel is seeking a contractor for early contractor involvement (ECI) to design remedial works at eight ventilation stations on the Mersey Tunnels estate, followed by a construction phase if costs are accepted. The work is based on findings from a Building Fabric Condition Survey.
-
Framework
Maintenance and Response 2 Framework
National Highways is procuring a seven-lot framework to deliver maintenance, reactive response, winter operations, and asset renewal across the strategic road network (motorways and major A roads). Each lot will have a single appointed supplier, with successful suppliers also joining an overarching framework for network resilience.
-
Small-firm friendlyFramework
C3770 Framework for Construction Related Consultancy
Cheshire East Council is establishing an eight-lot framework for construction-related professional services including architectural, engineering, surveying, and CDM advisory work. The framework will serve the council, its wholly owned companies, schools, academies, and associated organisations across Cheshire and potentially Warrington, Cheshire West and Chester, and the Mayoral Combined Authority.
-
Development Partner - Wallasey Town Hall Annexes
Wirral Council is seeking a developer to deliver affordable housing on two former annexe sites in Wallasey town centre. The sites form part of a regeneration masterplan and should accommodate up to four storeys.