Bus Depot Electrification Programme (Tranche 5+)
TfGM is establishing a framework with one partner to design and build electric bus charging infrastructure at multiple depots across Greater Manchester. The work starts with Wigan and Wythenshawe depots, progressing from detailed design through construction, with scope for further depots if delivery succeeds.
- ClosesNot stated
- Value£65m
- BuyerTransport for Greater Manchester
- WhereWigan and Wythenshawe bus depots, Greater Manchester (further depots TBC)
- CategoryTransport & vehicles, Construction & building works, Repair & maintenance
- RegionNorth West
You'll want to look if you are a major contractor with experience in electrical infrastructure and construction at operational transport facilities, capable of managing design development and full delivery across multiple sites over time.
You'll need
- RIBA stage 2 design already complete; contractor to deliver stages 3–4 and construction
- Ability to work around live bus operations with minimal disruption
Might not suit a small firm
- the contract itself is a large one