Talbot Street Rec Play Area Refurbishment
Remove old multiplay and swing frame unit with surfacing, then refurbish existing swing frame, roundabout and rocker units. Install new safety surfacing, asphalt path, trees and street furniture.
- Closed27 February 2026
- Value£40k
- BuyerCity of Bradford Metropolitan District Council
- WhereTalbot Street, Bradford
- CategoryFurniture, equipment & supplies, Construction & building works, Repair & maintenance
- RegionYorkshire & Humber
You'll want to look if you design and install playground equipment and safety surfacing, or handle the full spectrum of play area refurbishment from demolition through to landscaping
Possible incumbent
Landscape Engineering Ltd won three similar play area refurbishments for this buyer in January 2026. Inferred from prior awards to this buyer, not confirmed.