Bidwire
Browse contracts
Closed

Depot Fire Hydrant Design and Build - Tranche 1

Transport for London needs design and build of fire hydrant systems at two depot locations (Queens Park Sidings and Triangle Sidings) to bring non-compliant installations up to current British Standards and TfL standards. The existing systems cannot deliver adequate water pressure and flow for firefighting.

You'll want to look if you're a principal contractor with experience in fire hydrant system design and installation, and can demonstrate compliance with BS standards and TfL specifications.

  • Compliance with British Standards (BS) and TfL standards for fire hydrant systems
  • Principal contractor status required
  • it needs coverage across the whole UK

Walter Frank & Sons Limited undertook fire pressure regulated valves maintenance for TfL on the Elizabeth Line in February 2026. Inferred from prior awards to this buyer, not confirmed.

View on Find a Tender → (opens in a new tab)