Replacement of Bridge Bearings and Expansion Joint - Harrow Manorway Abbey Wood Flyover Spans 1 to 5
Remove and replace 36 bridge bearings and an expansion joint on the A2041 Harrow Manorway flyover. The contractor must design 16 of the bearings and all temporary works for spans 1–4, and carry out concrete repairs and traffic management.
- Closed2 April 2026
- Value£1.4m
- BuyerLondon Borough of Bexley
- WhereA2041 Harrow Manorway Abbey Wood Flyover and Felixstowe Road, Abbey Wood
- CategoryConstruction & building works
- RegionLondon
You'll want to look if you can design and install bridge bearings and temporary works, hold street works competence, and manage major traffic management on busy A-roads
You'll need
- Must design bearings for Spans 1–4 to client specification
- Must design and gain approval for temporary works for Spans 1–4
- Street works permits required on A2041 and Felixstowe Road
- Technical Approval Authority approval required for permanent and temporary works