Site Steam Upgrade Project - Principal Contractor Design & Installation Package
The Pirbright Institute needs a principal contractor to design and install a new steam distribution system, including supply, installation, commissioning and decommissioning of old equipment. The work involves mechanical, electrical and civil design through to handover.
- Closed27 July 2026
- ValueNot stated
- BuyerTHE PIRBRIGHT INSTITUTE
- WherePirbright Institute site
- CategoryFurniture, equipment & supplies, Building materials & structures, Construction & building works, Energy, fuel & utilities, Surveying, architecture & engineering
- RegionSouth East
You'll want to look if you have experience as a principal contractor on industrial steam and heating projects, can handle MEP design coordination, and can manage phased switchover of critical building services.
Possible incumbent
CJB Commissioning Services supplied a containerised steam boiler house rental in January 2026; Terra NRG Limited provided Stage 3 design in June 2026. Inferred from prior awards to this buyer, not confirmed.