STEVE BATCH 6 AND 7
Haringey Council needs adaptation of an existing bathroom with installation of accessibility features including a through-floor lift and ramp. The work is listed as STEVE Batch 6 and 7.
- Closed6 November 2025
- Value£129k
- BuyerLondon Borough of Haringey
- WhereLondon
- CategoryConstruction & building works
- RegionLondon
You'll want to look if you carry out residential bathroom adaptations and can install through-floor lifts and ramps, working to accessibility standards