WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Costain is seeking survey and RIBA Stage 4 design services for replacement of end-of-life ventilation components at Heathrow terminals. Work includes Variable Speed Drives, air circuit breakers, switchgear, LED lighting, and small power provision across multiple terminal locations.
- Closed9 June 2026, 21:34
- Published2 June 2026
- Value£5.0m
- BuyerCostain Limited (H7-Heathrow)
- WhereHeathrow terminals - CTA North and South, Terminal 4 North and South, and Sipson Farm
- CategorySurveying, architecture & engineering
- RegionLondon
You'll want to look if you have MEP design experience in large mechanical systems, particularly ventilation and electrical distribution in complex facilities like airports or industrial installations
You'll need
- RIBA Stage 4 design capability