Contracts

Small-firm friendly

Passenger Lift Replacement Within Diplomatic Mission

Full removal and replacement of a passenger lift in a London diplomatic building. The work includes the lift car, shaft equipment, controls integration, and all enabling works, and must comply with BS EN 81-72:2020, BS 9999, and Building Regulations.

  • BS EN 81-72:2020 compliance
  • BS 9999 compliance
  • Building Regulations Approved Document B compliance
  • BMS integration capability
  • Fire alarm interlock integration