Contracts
Construction & building works
Public sector contract notices in construction & building works, from Find a Tender and Contracts Finder.
Narrow by region
Construction & building works notices
-
ClosedSmall-firm friendly
PUBLIC SECTOR DECARBONISATION SCHEME 4 - DESIGN AND INSTALLATION OF AIR SOURCE HEAT PUMPS - SOWERBY BRIDGE SWIMMING POOL
Design, supply, installation and commissioning of an air source heat pump system to replace gas heating at Sowerby Bridge Swimming Pool & Fitness Centre. Single site project funded under the Public Sector Decarbonisation Scheme.
-
ClosedSmall-firm friendly
Modular Ramping Service in Somerset
Somerset Council needs a supplier to design, manufacture, and install modular access ramps and associated components for service users. The work is ongoing over the contract period to enable safe independent living at home or in community settings.
-
ClosedSmall-firm friendly
Beacon - Lift Replacement Projects 2026/2027
Beacon Cymru Group is tendering for design, manufacture, supply, installation and commissioning of vertical transportation systems at four named residential properties in Wales. The contract covers the full lifecycle from design through to commissioning.
-
ClosedSmall-firm friendly
Installation of Sewage Treatment Plant System - Marshall Farm, Farcet
Installation of a sewage treatment plant system at Marshall Farm, Farcet. The council manages a 34,000-acre farm estate with 160 tenants across Cambridgeshire.
-
ClosedSmall-firm friendly
BAF26024 - Door & Access Controls CCTV
Remove and replace an existing door access control system and CCTV system at Bron Afon properties in Torfaen. The new CCTV will be cloud-based.
-
ClosedSmall-firm friendly
Design and Installation of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site
Design, supply, installation and commissioning of a 1.1MWp solar photovoltaic array with 2MWh DC battery energy storage system at Newport recycling centre depot. Turnkey EPC contract with grid connection and full compliance requirements.
-
ClosedSmall-firm friendly
CAS-01379-H9D9F1 - Eastleigh Court – Stone Wall Repairs
Repair and reinstatement of a deteriorated stone boundary wall at Eastleigh Court, Taunton. Work includes dismantling unstable sections, salvaging and reusing existing stone, rebuilding, repointing, and making good adjoining surfaces.
-
ClosedSmall-firm friendly
2026 - 1081 Remedial Insurance Repairs from Fire, Flood, Structural, Disrepairs and Other Associated Works
Citizen Housing Group is appointing up to 4 contractors to handle structural and insurance-related repair work - fire, flood, disrepair, and other damage - across their portfolio. Work is estimated at around £100,000 per year for 12 months, with an option to extend.
-
ClosedSmall-firm friendly
Refurbishment of the Town Pump, Cornhill, Dorchester
Dorchester Town Council wants a contractor to refurbish the Grade II listed Town Pump on Cornhill. The work involves dismantling the base, rebuilding it in Portland Stone, straightening the leaning column, cleaning and repairing stonework using traditional methods, and installing new drinking features.
-
ClosedSmall-firm friendly
5531 - Lewis School, Pengam - Refurbishment of Food Technology Room
Refurbishment of a food technology room at Lewis School, Pengam. Work follows drawings and a schedule of works, with four weeks on site starting September 2026.
-
ClosedSmall-firm friendly
Lotherton Hall – Kiosk Replacement
Design, supply and install a replacement visitor kiosk at Lotherton Hall Estate to replace a deteriorated 20-year-old structure. The new kiosk must address poor ergonomics, ventilation and insulation in the existing design.
-
ClosedSmall-firm friendly
ENQ1347 - Ice Rink for Festive Derby
Derby City Council needs supply, installation and de-rig of a 300 sqm real ice rink for a four-week festive season event. The work runs from September 2026 to January 2027.
-
Closed
Bus Stop Infrastructure Improvements Ceredigion 2026/27
Cyngor Gwynedd is seeking contractors to carry out improvement works on bus stops and shelters across Ceredigion. The work is scheduled for 2026/27.
-
ClosedSmall-firm friendly
Pont Dolhendre, Llanuwchllyn
Replace a defective three-pipe armco bridge with a new reinforced concrete single-span beam bridge at Pont Dolhendre, Llanuwchllyn. The work will be done in two phases to keep the road open; all in-river work must finish by 17 October.
-
ClosedSmall-firm friendly
Ibrahim Batch 9 - Council
London Borough of Haringey is adapting an existing bathroom and installing specialist items including a stair lift and galvanised rails. The work is a single property adaptation.
-
ClosedSmall-firm friendly
High 5 4 Heritage - Professional Services in Respect of Repair and Restoration Works to the Mechanics Theatre, Burnley
Burnley Borough Council is seeking consultant services to manage repair and restoration works to the Mechanics Theatre as part of a five-year heritage-led regeneration programme in Burnley's Civic Core, funded by the National Lottery Heritage Fund.
-
ClosedSmall-firm friendly
Supply and Installation of Replacement Gates at Highgate, Haden Cross, Sutton Coldfield and Fallings Park Fire Stations
Supply and install replacement gates at four West Midlands fire stations: Highgate, Haden Cross, Sutton Coldfield and Fallings Park. The supplier must also remove and decommission the old gates.
-
ClosedSmall-firm friendly
LB HIllingdon- Grange Park Wetlands- Flood Restoration Project
London Borough of Hillingdon is seeking suppliers for flood restoration works at Grange Park Wetlands. Details are in the project brief and concept design documents within the tender pack.
-
ClosedSmall-firm friendly
LB Hillingdon-Queens Walk East- Flood Restoration Project
London Borough of Hillingdon is seeking contractors for flood restoration works at Queens Walk East. The scope is defined in the project brief and technical documents in the tender pack.
-
Closed
Building Refurbishments
Scottish Power is running a five-year programme of office and depot refurbishments across its property portfolio in England, Scotland and Wales. Work will focus on creating modern, safe, efficient and sustainable workplaces.
-
ClosedSmall-firm friendly
Tunnel Segment Production Monitoring System
Sizewell C needs a monitoring and traceability system for 39,000 precast concrete tunnel segments manufactured at Avonmouth, transported by road and rail, stored across four facilities, and installed in three tunnel boring machines. The system must track segments from casting through installation and maintain quality, inventory and supply chain transparency.
-
ClosedSmall-firm friendly
Tunnel Segment Production Monitoring System
Sizewell C needs a monitoring and traceability system for 39,000 precast concrete tunnel segments. The system must track segments from casting through transport, storage across four facilities, and installation in three tunnel boring machines.
-
ClosedSmall-firm friendly
NNR19/0558 - Stodmarsh Ditch Restoration with associated bund creation and culvert creation
Restoration of a historic ditch at Stodmarsh National Nature Reserve, including reprofiling, bund creation, and culvert installation. The site contains deep soft silt in places that may not support standard excavators.
-
ClosedSmall-firm friendly
Rossett Park Revival - Pride in Place
Rossett Community Council wants a contractor to redevelop the children's play area in Rossett Park, removing old equipment and installing new inclusive play structures for older children, with safety surfacing, accessible pathways, landscaping and biodiversity work.
-
ClosedSmall-firm friendly
Great Yarmouth Play Area redesign, refurbishment and installation at 8 Sites
Great Yarmouth Borough Council wants to redesign, refurbish and install play equipment across 8 sites. The work includes both equipment supply and landscaping.