Contracts
ClosedSmall-firm friendly
Attenuation Precast Tanks
Kilnbridge Construction needs a sub-subcontractor to design, manufacture and supply two precast concrete attenuation tanks for the HS2 Old Oak Common Station Works. The work includes detailed design development from RIBA stage 4 to 5, BIM modelling, and supply of precast base, wall and roof units.
- Closed11 September 2025, 09:00
- Published4 September 2025
- Value£1.0m
- BuyerKilnbridge Construction Services Ltd
- WhereHS2 Old Oak Common Station, eastern site area
- CategoryBuilding materials & structures
- RegionLondon
You'll want to look if you design and manufacture precast concrete structures and have experience with large bespoke tank installations
You'll need
- Design responsibility from RIBA stage 4 to RIBA stage 5
- BIM modelling capability
- Precast concrete manufacturing capability