Contracts

ClosedSmall-firm friendly

Attenuation Precast Tanks

Kilnbridge Construction needs a sub-subcontractor to design, manufacture and supply two precast concrete attenuation tanks for the HS2 Old Oak Common Station Works. The work includes detailed design development from RIBA stage 4 to 5, BIM modelling, and supply of precast base, wall and roof units.

You'll want to look if you design and manufacture precast concrete structures and have experience with large bespoke tank installations

  • Design responsibility from RIBA stage 4 to RIBA stage 5
  • BIM modelling capability
  • Precast concrete manufacturing capability